Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
06/14/2023
Applicant:
Description:
Commercial tenant improvement consisting of but not limited to interior partitions, ceilings, finishes; new concrete slab; minor electrical (subpanels, lighting, and receptacles); mechanical (ductwork

Permit Reviews

Permit Number - TC-COM-0623-01502
Permit Status: Complete
Permit Description: Commercial tenant improvement consisting of but not limited to interior partitions, ceilings, finishes; new concrete slab; minor electrical (subpanels, lighting, and receptacles); mechanical (ductwork
Start Date Submittal Complete Date Status  
05/09/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/13/2024 APPROVED Review Details
06/14/2023 COMMERCIAL REVIEW - FULL v.1 07/03/2023 REQUIRES RESUBMIT Review Details
07/26/2023 RESTAMP - COMMERCIAL v.1 07/26/2023 APPROVED Review Details
07/19/2023 COMMERCIAL REVIEW - FULL v.2 07/26/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-0623-01502
Permit Status: Complete
Permit Description: Commercial tenant improvement consisting of but not limited to interior partitions, ceilings, finishes; new concrete slab; minor electrical (subpanels, lighting, and receptacles); mechanical (ductwork
Date Description Comments
03/06/2024 AIR BALANCING REPORT IS REQUIRED.
06/14/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
03/06/2024 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
03/06/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0623-01502
Permite Description: Commercial tenant improvement consisting of but not limited to interior partitions, ceilings, finishes; new concrete slab; minor electrical (subpanels, lighting, and receptacles); mechanical (ductwork
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
10/02/2023 COT - HCPL - Plumbing Intermediate N/A Canceled
12/11/2023 BULD - Electrical Clearance N/A Not Applicable
COT - FCON - Sprinkler - Final N/A Not Ready Ok to install ceiling tiles.
COT - FCON - Hood System - Final N/A Not Ready Contractor cancelled for a later date.
10/30/2023 COT - HCME - Mechanical Intermediate N/A Partial Pass
12/28/2023 COT - HCPL - Plumbing Final N/A Not Ready
01/02/2024 ENGR Engineering Final N/A Not Applicable
12/29/2023 COT - HCBU - Building Final N/A Partial Pass Recommend TCO level 2
12/29/23: Level 4 TCO

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0623-01502
Permit Description: Commercial tenant improvement consisting of but not limited to interior partitions, ceilings, finishes; new concrete slab; minor electrical (subpanels, lighting, and receptacles); mechanical (ductwork
Total Completed Inspections - 24
Date Description Inspector Results Comments
10/03/2023 COT - HCPL - Rough Soil Passed
10/16/2023 COT - HCBU - Preslab Passed 10/16/23 reinforcement in place
10/30/2023 COT - HCPL - Gas Pressure Test Passed
10/30/2023 COT - HCPL - Plumbing Intermediate Passed
10/30/2023 COT - HCEL - Electrical Intermediate Passed
10/30/2023 COT - HCBU - Framing Passed
12/05/2023 COT - HCPL - Plumbing Above Ceiling Passed
12/05/2023 COT - HCME - Mechanical Above Ceiling Passed
12/05/2023 COT - HCEL - Electrical Above Ceiling Passed
12/05/2023 COT - HCBU - Building Above Ceiling Passed
12/11/2023 COT - HCME - Kitchen Hood Passed 12/11/23: smoke test passed.
12/22/2023 COT - FCON - Hood System - Final Passed
12/22/2023 COT - FCON - Fire - Final Passed
12/28/2023 COT - HCEL - Electrical Final Passed
12/28/2023 COT - HCME - Mechanical Final Passed
12/29/2023 COT - BULD - SWG Clearance Passed
12/29/2023 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
12/29/2023 COT - HCME - Mechanical Intermediate Passed
12/29/2023 COT - HCME - Venting Passed
12/29/2023 COT - HCPL - Gas Final Passed
12/29/2023 COT - HCPL - Plumbing Final Passed
01/02/2024 TRSP - ROW - Final/Close-Out Passed
01/04/2024 COT - HCBU - Building Final Passed Recommend TCO level 2
12/29/23: Level 4 TCO
1/4/23:passed
03/06/2024 COT - HCBU - Building Progress Passed