Permit: TC-COM-0623-01462
Permit Details
Apply Date:
06/08/2023
Applicant:
Craig Molling
Description:
Replace, like for like, the following sun damaged electrical equipment and backing board. 1. 100A 3ph meter base 1. 100A 3ph N3R fused D/C 1. 30A 3ph N3R fused D/C 1. 120/240v out, 3kVA 480V transformer. 1. 3/4" CCX plywood backer board. 1. 3Ph power panel for pond pump to remain. 1. 1Ph 125ML816 N3R panel to remain.
Permit Reviews
Permit Number - TC-COM-0623-01462
Permit Status: Issued
Permit Description: Replace, like for like, the following sun damaged electrical equipment and backing board.
1. 100A 3ph meter base
1. 100A 3ph N3R fused D/C
1. 30A 3ph N3R fused D/C
1. 120/240v out, 3kVA 480V
transformer.
1. 3/4" CCX plywood backer board.
1. 3Ph power panel for pond pump to
remain.
1. 1Ph 125ML816 N3R panel to remain.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/08/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 06/26/2023 | APPROVED |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0623-01462
Permit Description: Replace, like for like, the following sun damaged electrical equipment and backing board.
1. 100A 3ph meter base
1. 100A 3ph N3R fused D/C
1. 30A 3ph N3R fused D/C
1. 120/240v out, 3kVA 480V
transformer.
1. 3/4" CCX plywood backer board.
1. 3Ph power panel for pond pump to
remain.
1. 1Ph 125ML816 N3R panel to remain.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/19/2023 | BULD - Electrical Clearance | Passed | Approved 3phase panel upgrade and disconnects, INCR Clearance was called into TEP at 11:15am | |
| 10/19/2023 | COT - LCEL - Electrical Final | Passed | ||
| 10/19/2023 | COT - LCEL - Electrical Intermediate | Passed |