Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
06/07/2023
Applicant:
Kerri Drown
Description:
Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.

Permit Reviews

Permit Number - TC-COM-0623-01456
Permit Status: Complete
Permit Description: Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
Start Date Submittal Complete Date Status  
10/19/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/22/2023 APPROVED Review Details
07/03/2023 COMMERCIAL REVIEW - FULL v.2 07/11/2023 APPROVED Review Details
06/07/2023 COMMERCIAL REVIEW - FULL v.1 06/26/2023 REQUIRES RESUBMIT Review Details
07/11/2023 RESTAMP - COMMERCIAL v.1 07/12/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-0623-01456
Permit Status: Complete
Permit Description: Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
Date Description Comments
07/11/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
06/07/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
07/11/2023 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
11/01/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0623-01456
Permite Description: Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
COT - HCME - Mechanical Final N/A Requested
COT - HCPL - Plumbing Final N/A Requested
09/25/2023 ENGR Engineering Final N/A Partial Pass contractor needs to replace two dead trees. Remove the riprap and install the filter fabric underneath the riprap. Finish putting in the fence around the patio. Good for T.C.O 1.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0623-01456
Permit Description: Tenant Interior Upfit of Shell Building for a new Starbucks coffee shop. Signage submitted under separate permit.
Total Completed Inspections - 18
Date Description Inspector Results Comments
07/27/2023 COT - HCEL - Electrical Underground Passed
07/27/2023 COT - HCPL - Rough Soil Passed
08/16/2023 COT - HCBU - Excavation/Rebar/Zoning Passed
08/18/2023 COT - HCPL - Plumbing Intermediate Passed Plumbing rough-in is complete. Okay to cover with drywall.
08/18/2023 COT - HCEL - Electrical Intermediate Passed Electrical rough-in is complete. Okay to cover with drywall.
08/18/2023 COT - HCME - Mechanical Intermediate Passed Mechanical rough-in is complete. Okay to cover with drywall.
08/18/2023 COT - HCBU - Framing Passed Rough framing is complete. Okay to cover with drywall.
09/15/2023 COT - HCBU - Building Above Ceiling Passed
09/15/2023 COT - HCEL - Electrical Above Ceiling Passed
09/15/2023 COT - HCME - Mechanical Above Ceiling Passed
09/15/2023 COT - HCPL - Plumbing Above Ceiling Passed
09/25/2023 BULD - Electrical Clearance Passed Electrical clearance was issued under shell building permit TC-COM-1122-00154 on July 22, 2023 by Tony G.
09/25/2023 COT - FCON - Fire - Final Passed
09/22/2023 TRSP - ROW - Final/Close-Out Passed
09/25/2023 COT - HCBU - Building Final Passed Construction of Tenant Improvements is complete. Electrical, mechanical, and plumbing fixtures and equipment is installed and fully functional. Interior booths, tables, and chairs are in place in lobby area. All Starbucks equipment is installed and operational. Restrooms have ADA accessible hardware installed. Fire has completed there inspection. Health is scheduled for tomorrow to perform their inspection. Okay to issue Level 4 Certificate of Occupancy once all required inspections are completed.
09/25/2023 COT - HCEL - Electrical Final Passed Construction of Tenant Improvements is complete. Electrical, mechanical, and plumbing fixtures and equipment is installed and fully functional. Interior booths, tables, and chairs are in place in lobby area. All Starbucks equipment is installed and operational. Restrooms have ADA accessible hardware installed. Fire has completed there inspection. Health is scheduled for tomorrow to perform their inspection. Okay to issue Level 4 Certificate of Occupancy once all required inspections are completed.
09/25/2023 COT - HCEL - Outdoor Lighting Passed Construction of Tenant Improvements is complete. Electrical, mechanical, and plumbing fixtures and equipment is installed and fully functional. Interior booths, tables, and chairs are in place in lobby area. All Starbucks equipment is installed and operational. Restrooms have ADA accessible hardware installed. Fire has completed there inspection. Health is scheduled for tomorrow to perform their inspection. Okay to issue Level 4 Certificate of Occupancy once all required inspections are completed.
10/17/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
AIR BALANCE_V1.PDF DOCUMENTS VIEW
AMERICO BUILDERS - STARBUCKS 4801 S. CAMPBELL LAB RESULTS-ADDITIONAL DOC-2023-10-19_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
CONS-CONS-PLANS_V1.PDF DOCUMENTS VIEW
RESPONSE LETTER_V1.PDF DOCUMENTS VIEW
COMCHECK_V1.PDF DOCUMENTS VIEW
CONS-PLANS_V1.PDF DOCUMENTS VIEW