Permit: TC-COM-0526-00687
Permit Details
Apply Date:
05/11/2026
Applicant:
Allison Zellmann
Description:
TENANT IMPROVEMENT OF EXISTING BUILDING, REMOVING CMU BLOCKS OUT OF THE NORTH AND WEST WALLS AS WELL AS A FRAMED WALL OPENING AND INSTALLING 5 NEW WINDOWS.
Permit Reviews
Permit Number - TC-COM-0526-00687
Permit Status: Complete
Permit Description: TENANT IMPROVEMENT OF EXISTING BUILDING, REMOVING CMU BLOCKS OUT OF THE NORTH AND WEST WALLS AS WELL AS A FRAMED WALL OPENING AND INSTALLING 5 NEW WINDOWS.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/07/2026 | ADMINISTRATIVE v.2 | 07/07/2026 | REQUIRES RESUBMIT |
| 07/08/2026 | ADMINISTRATIVE v.3 | 07/08/2026 | APPROVED |
| 06/04/2026 | ADMINISTRATIVE v.1 | 06/04/2026 | REQUIRES RESUBMIT |
| 07/14/2026 | SPECIAL INSPECTION REVIEW v.2 | 07/20/2026 | APPROVED |
| 05/11/2026 | COMMERCIAL REVIEW - FULL v.1 | 06/03/2026 | APPROVED |
| 07/08/2026 | SPECIAL INSPECTION REVIEW v.1 | 07/09/2026 | REQUIRES RESUBMIT |
| 08/10/2026 | SPECIAL INSPECTION REVIEW v.2 | 08/12/2026 | APPROVED |
| 07/30/2026 | SPECIAL INSPECTION REVIEW v.1 | 07/31/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0526-00687
Permit Status: Complete
Permit Description: TENANT IMPROVEMENT OF EXISTING BUILDING, REMOVING CMU BLOCKS OUT OF THE NORTH AND WEST WALLS AS WELL AS A FRAMED WALL OPENING AND INSTALLING 5 NEW WINDOWS.
| Date | Description | Comments |
|---|---|---|
| 07/20/2026 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 05/11/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 05/26/2026 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 05/11/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 05/26/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0526-00687
Permite Description: TENANT IMPROVEMENT OF EXISTING BUILDING, REMOVING CMU BLOCKS OUT OF THE NORTH AND WEST WALLS AS WELL AS A FRAMED WALL OPENING AND INSTALLING 5 NEW WINDOWS.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2026 | COT - FCON - Fire - Final | N/A | Not Applicable | |
| 07/22/2026 | COT - FCON - Sprinkler - Final | N/A | Not Applicable | |
| 07/22/2026 | COT - LCPL - Plumbing Final | N/A | Not Applicable | |
| 07/22/2026 | COT - LCBU - Masonry Pregrout | N/A | Not Applicable | |
| 07/29/2026 | COT - LCEL - Electrical Final | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0526-00687
Permit Description: TENANT IMPROVEMENT OF EXISTING BUILDING, REMOVING CMU BLOCKS OUT OF THE NORTH AND WEST WALLS AS WELL AS A FRAMED WALL OPENING AND INSTALLING 5 NEW WINDOWS.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2026 | COT - LCME - Mechanical Final | Passed | Passed | |
| 07/22/2026 | COT - LCBU - Framing | Passed | Passed | |
| 07/29/2026 | COT - LCBU - Building Final | Passed |