Permit: TC-COM-0526-00677
Permit Details
Apply Date:
05/07/2026
Applicant:
Eligio Lopez
Description:
Commercial office renovation
Permit Reviews
Permit Number - TC-COM-0526-00677
Permit Status: Approved
Permit Description: Commercial office renovation
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/11/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/16/2026 | APPROVED |
| 05/11/2026 | COMMERCIAL REVIEW - FULL v.1 | 06/03/2026 | REQUIRES RESUBMIT |
| 06/04/2026 | COMMERCIAL REVIEW - FULL v.2 | 06/05/2026 | APPROVED |
| 08/26/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/27/2026 | APPROVED |
| 06/05/2026 | ADMINISTRATIVE v.1 | 06/05/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0526-00677
Permit Status: Approved
Permit Description: Commercial office renovation
| Date | Description | Comments |
|---|---|---|
| 06/02/2026 | AIR BALANCING REPORT IS REQUIRED. | |
| 05/11/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 06/04/2026 | Parcel is located within a regulatory floodplain. Engineering review required prior to issuance, once floodplain use permit TE-FPU-0526-00174 has been paid. | |
| 05/11/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 06/02/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Completed Inspections
Permit Status: Approved
Permit Number: TC-COM-0526-00677
Permit Description: Commercial office renovation
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2026 | COT - HCBU - Framing | Passed | ||
| 06/16/2026 | COT - HCPL - Rough Soil | Passed | ||
| 06/16/2026 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 06/16/2026 | COT - HCEL - Electrical Intermediate | Passed | ||
| 08/05/2026 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 08/14/2026 | COT - HCBU - Building Above Ceiling | Passed | ||
| 08/21/2026 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 08/24/2026 | COT - FCON - Fire - Final | Passed | ||
| 09/14/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 09/15/2026 | COT - HCBU - Building Final | Passed | ||
| 09/15/2026 | COT - HCEL - Electrical Final | Passed | ||
| 09/15/2026 | COT - HCME - Mechanical Final | Passed | ||
| 09/15/2026 | COT - HCBU - TCO | Passed | ||
| 09/15/2026 | COT - HCPL - Plumbing Final | Passed | ||
| 09/15/2026 | COT - HCME - Mechanical Intermediate | Passed | ||
| 09/15/2026 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 09/15/2026 | ENGR Engineering Final | Passed |