Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
05/29/2025
Applicant:
christopher Dilts
Description:
Service upgrade. Coordinate with TEP demo old 60 amp disconnects, and gutter CT. install new 400 amp met er 6 pack and overhead service. new 1/0 water bond two 8 foot ground rods new #4 bare water bond.

Permit Reviews

Permit Number - TC-COM-0525-01066
Permit Status: Inspections
Permit Description: Service upgrade. Coordinate with TEP demo old 60 amp disconnects, and gutter CT. install new 400 amp met er 6 pack and overhead service. new 1/0 water bond two 8 foot ground rods new #4 bare water bond.
Start Date Submittal Complete Date Status  
05/29/2025 COMMERCIAL PDSD SIMPLE REVIEW v.1 05/29/2025 REQUIRES RESUBMIT Review Details
06/05/2025 COMMERCIAL PDSD SIMPLE REVIEW v.2 06/05/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0525-01066
Permit Status: Inspections
Permit Description: Service upgrade. Coordinate with TEP demo old 60 amp disconnects, and gutter CT. install new 400 amp met er 6 pack and overhead service. new 1/0 water bond two 8 foot ground rods new #4 bare water bond.
Date Description Comments
05/29/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0525-01066
Permit Description: Service upgrade. Coordinate with TEP demo old 60 amp disconnects, and gutter CT. install new 400 amp met er 6 pack and overhead service. new 1/0 water bond two 8 foot ground rods new #4 bare water bond.
Total Completed Inspections - 3
Date Description Inspector Results Comments
09/16/2025 COT - LCEL - Grounding/Bonding Passed
09/24/2025 BULD - Electrical Clearance Passed
12/04/2025 COT - LCEL - Electrical Final Passed