Permit: TC-COM-0525-01028
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
1625 E PRINCE RD UNIT 65
Address NEW:
1625 E PRINCE RD UNIT 65
Apply Date:
05/21/2025
Applicant:
Dean Bagley
Description:
We will connect a new 3/4” black iron pipe to the meter and run it above the roof towards unit 65, approximately 20ft. We will remove the backsplash and drywall behind the stove and cabinet. We will use 10ft of 3/4” black iron pipe and connect to the fitting on the roof. We will install a new 3/4” shut-off and supply line for the stove. Once all connections are made, we will pressure test the gas line for any leaks. If no leaks are found, we will clean up all debris.
Permit Reviews
Permit Number - TC-COM-0525-01028
Permit Status: Complete
Permit Description: We will connect a new 3/4” black iron pipe to the meter and run it above the roof towards unit 65, approximately 20ft.
We will remove the backsplash and drywall behind the stove and cabinet.
We will use 10ft of 3/4” black iron pipe and connect to the fitting on the roof.
We will install a new 3/4” shut-off and supply line for the stove.
Once all connections are made, we will pressure test the gas line for any leaks.
If no leaks are found, we will clean up all debris.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/21/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 05/23/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0525-01028
Permit Status: Complete
Permit Description: We will connect a new 3/4” black iron pipe to the meter and run it above the roof towards unit 65, approximately 20ft.
We will remove the backsplash and drywall behind the stove and cabinet.
We will use 10ft of 3/4” black iron pipe and connect to the fitting on the roof.
We will install a new 3/4” shut-off and supply line for the stove.
Once all connections are made, we will pressure test the gas line for any leaks.
If no leaks are found, we will clean up all debris.
| Date | Description | Comments |
|---|---|---|
| 05/23/2025 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 05/21/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0525-01028
Permit Description: We will connect a new 3/4” black iron pipe to the meter and run it above the roof towards unit 65, approximately 20ft.
We will remove the backsplash and drywall behind the stove and cabinet.
We will use 10ft of 3/4” black iron pipe and connect to the fitting on the roof.
We will install a new 3/4” shut-off and supply line for the stove.
Once all connections are made, we will pressure test the gas line for any leaks.
If no leaks are found, we will clean up all debris.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2025 | COT - BULD - SWG Clearance | Passed | Approved gas piping and pressure test - SWG Clearance is required for unit #65 reconnection | |
| 06/13/2025 | COT - LCPL - Gas Pressure Test | Passed | ||
| 06/13/2025 | COT - LCPL - Plumbing Final | Passed |