Permit: TC-COM-0525-01027
Permit Details
Apply Date:
05/21/2025
Applicant:
ROBERT WOODRUFF
Description:
Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting.
Permit Reviews
Permit Number - TC-COM-0525-01027
Permit Status: Complete
Permit Description: Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/01/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/03/2026 | APPROVED |
| 05/21/2025 | COMMERCIAL REVIEW - FULL v.1 | 06/12/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0525-01027
Permit Status: Complete
Permit Description: Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting.
| Date | Description | Comments |
|---|---|---|
| 06/12/2025 | AIR BALANCING REPORT IS REQUIRED FOR OSA TO FC-1. | |
| 05/21/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0525-01027
Permite Description: Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting.
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2025 | COT - LCEL - Electrical Intermediate | N/A | Re-inspection required | 9-29-25: replace exterior patio receptacle to a weather proof gfci and replace double pole breaker for new ac to a 20 amp. These items will be verified at finals. |
| 12/18/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 12-18-25: not applicable. |
| 12/18/2025 | COT - LCPL - Plumbing Final | N/A | Not Applicable | 12-18-25: not applicable. |
| 01/07/2026 | COT - FCON - Fire - Final | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0525-01027
Permit Description: Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2025 | BULD - Electrical Clearance | Passed | 9-29-25: okay to energize panel 187353666. INCR issued to TEP. | |
| 09/29/2025 | COT - LCME - Mechanical Intermediate | Passed | 9-29-25: mechanical intermediate approved. | |
| 10/13/2025 | COT - LCME - Mechanical Final | Passed | ||
| 11/07/2025 | COT - LCBU - Building Final | Passed | 11-7-25: building final approved. | |
| 11/07/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 11/07/2025 | COT - LCEL - Electrical Final | Passed | 11-7-25: electrical final approved. | |
| 01/07/2026 | COT - HCBU - TCO | Passed | 1-7-26: okay for a Level 4 TCO. Note: see condition regarding air balance requirement. |