Permit: TC-COM-0525-01015
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
5626 E GLENN ST UNIT C
Address NEW:
5626 E GLENN ST UNIT C
Apply Date:
05/19/2025
Applicant:
Matthew Gruendler
Description:
Run new 3/4" black pipe from meter to supply gas to water heater and furnace. Run 1/2" black pipe to water heater after the tee.
Permit Reviews
Permit Number - TC-COM-0525-01015
Permit Status: Complete
Permit Description: Run new 3/4" black pipe from meter to supply gas to water heater and furnace. Run 1/2" black pipe to water heater after the tee.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/19/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 05/21/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0525-01015
Permit Status: Complete
Permit Description: Run new 3/4" black pipe from meter to supply gas to water heater and furnace. Run 1/2" black pipe to water heater after the tee.
| Date | Description | Comments |
|---|---|---|
| 05/19/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0525-01015
Permite Description: Run new 3/4" black pipe from meter to supply gas to water heater and furnace. Run 1/2" black pipe to water heater after the tee.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/23/2025 | COT - LCPL - Gas Pressure Test | N/A | Deferred | 5-23-25. SWG clearance. Pressure verified, correct piping, flashings in place and all lines are secured. Shut off valves present. Ready for SWG. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0525-01015
Permit Description: Run new 3/4" black pipe from meter to supply gas to water heater and furnace. Run 1/2" black pipe to water heater after the tee.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/23/2025 | COT - LCPL - Plumbing Final | Passed | 5-23-25. SWG clearance. Pressure verified, correct piping, flashings in place and all lines are secured. Shut off valves present. Ready for SWG. | |
| 06/02/2025 | COT - BULD - SWG Clearance | Passed | 6/2/25; SWG CLEARANCE APPROVED |