Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0525-01013
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
6810 E TANQUE VERDE RD
Address NEW:
6810 E TANQUE VERDE RD
Apply Date:
05/19/2025
Applicant:
Andrew Venne
Description:
Remodel of existing restaurant, Previously Eegee's
Permit Reviews
Permit Number - TC-COM-0525-01013
Permit Status: Issued
Permit Description: Remodel of existing restaurant,
Previously Eegee's
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/24/2025 | COMMERCIAL REVIEW - FULL v.3 | 07/30/2025 | APPROVED |
| 06/18/2025 | COMMERCIAL REVIEW - FULL v.2 | 06/18/2025 | IN REVIEW |
| 05/20/2025 | COMMERCIAL REVIEW - FULL v.1 | 06/17/2025 | REQUIRES RESUBMIT |
| 07/30/2025 | RESTAMP - COMMERCIAL v.1 | 08/04/2025 | APPROVED |
| 12/10/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/16/2025 | APPROVED |
| 08/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/06/2025 | APPROVED |
| 07/10/2025 | HAST - COMMERCIAL NEW ADD/ALT FAST TRACK v.1 | 07/24/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0525-01013
Permit Status: Issued
Permit Description: Remodel of existing restaurant,
Previously Eegee's
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 06/09/2025 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
Conditions
Permit Number - TC-COM-0525-01013
Permit Status: Issued
Permit Description: Remodel of existing restaurant,
Previously Eegee's
| Date | Description | Comments |
|---|---|---|
| 06/09/2025 | AIR BALANCING AND HOOD PERFORMANCE REPORT IS REQUIRED. | |
| 05/20/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 08/01/2025 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor. | |
| 07/24/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0525-01013
Permite Description: Remodel of existing restaurant,
Previously Eegee's
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 10/23/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| COT - FCON - Hood System - Final | N/A | Not Ready | Not ready for fire at this time. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0525-01013
Permit Description: Remodel of existing restaurant,
Previously Eegee's
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2025 | COT - LCBU - Framing | Passed | OK to insulate and cover progress areas. | |
| 09/04/2025 | COT - LCPL - Rough Soil | Passed | Ok to cover interior progress areas. | |
| 09/08/2025 | COT - LCBU - Preslab | Passed | Reinforcements at saw cuts. Okay for concrete placement. 9/8/2025 | |
| 09/18/2025 | COT - LCPL - Gas Pressure Test | Passed | ||
| 09/18/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 09/18/2025 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 10/14/2025 | COT - LCME - Kitchen Hood | Passed | 1st layer approved and began with 2nd layer fire wrap 10/14/2025 | |
| 11/13/2025 | COT - LCEL - Electrical Above Ceiling | Passed | Also looked at Mechanical Final; OK to drop tile. | |
| 11/14/2025 | COT - LCME - Mechanical Intermediate | Passed | ||
| 12/02/2025 | ENGR Engineering Final | Passed | ||
| 12/02/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 12/08/2025 | COT - FCON - Fire - Final | Passed | ||
| 12/08/2025 | COT - FCON - Hood System - Final | Passed | ||
| 12/09/2025 | COT - LCBU - Building Final | Passed | ||
| 12/09/2025 | COT - LCEL - Electrical Final | Passed | ||
| 12/09/2025 | COT - LCME - Mechanical Final | Passed | ||
| 12/09/2025 | COT - LCPL - Plumbing Final | Passed | ||
| 12/09/2025 | COT - LCEL - Grounding/Bonding | Passed |