Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Fees Due
Type:
Commercial Building
Address NEW:
300 S FIRE CENTRAL PL
Apply Date:
05/15/2025
Applicant:
Architecture & Engineering City of Tucson
Description:
Provide (2) New EV Chagers for Fire Central

Permit Reviews

Permit Number - TC-COM-0525-01004
Permit Status: Fees due
Permit Description: Provide (2) New EV Chagers for Fire Central
Start Date Submittal Complete Date Status  
05/16/2025 COMMERCIAL REVIEW - LIMITED v.1 06/09/2025 APPROVED Review Details
06/11/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/12/2025 APPROVED Review Details
09/17/2025 ADMINISTRATIVE v.1 09/17/2025 REQUIRES RESUBMIT Review Details
10/20/2025 COMMERCIAL REVIEW - LIMITED v.1 11/04/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0525-01004
Permit Status: Fees due
Permit Description: Provide (2) New EV Chagers for Fire Central
Total Outstanding Activity Conditions - 2
Date Name
05/30/2025 SPECIAL INSPECTION OF POST-INSTALLED ANCHORS IS REQUIRED.
06/12/2025 Post-Installed Anchor Inspection Report is required.

Conditions

Permit Number - TC-COM-0525-01004
Permit Status: Fees due
Permit Description: Provide (2) New EV Chagers for Fire Central
Date Description Comments
06/12/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/20/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
05/30/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Documents

File Name Document Type  
CONS-P24010 FIRE CENTRAL EV CHARGERS - DWGS FULL SET REV2_2025-08-06_V1.PDF DOCUMENTS VIEW
2025-06-10 SCHNEIDER 124170 SI CERTIFICATE-2025-06-10_V1.PDF DOCUMENTS VIEW
CONS-CONS-2024-12-10 124170 COT EV CHARGE 100 CALCULATION PACKAGE - SEALED_V2 (2)_V1.PDF DOCUMENTS VIEW