Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
05/13/2025
Applicant:
Alicia Simmons
Description:
Foundation, Superstructure, Core and Shell Plans for the Exterior Canopy

Permit Reviews

Permit Number - TC-COM-0525-00978
Permit Status: Complete
Permit Description: Foundation, Superstructure, Core and Shell Plans for the Exterior Canopy
Start Date Submittal Complete Date Status  
06/12/2026 SPECIAL INSPECTION REVIEW v.5 06/15/2026 APPROVED Review Details
05/14/2026 SPECIAL INSPECTION REVIEW v.3 05/14/2026 REQUIRES RESUBMIT Review Details
06/16/2025 RESTAMP - COMMERCIAL v.1 06/23/2025 APPROVED Review Details
06/09/2025 COMMERCIAL REVIEW - LIMITED v.2 06/16/2025 APPROVED Review Details
05/27/2026 SPECIAL INSPECTION REVIEW v.4 05/28/2026 REQUIRES RESUBMIT Review Details
05/04/2026 SPECIAL INSPECTION REVIEW v.1 05/05/2026 REQUIRES RESUBMIT Review Details
05/07/2026 SPECIAL INSPECTION REVIEW v.2 05/08/2026 REQUIRES RESUBMIT Review Details
05/15/2025 COMMERCIAL REVIEW - LIMITED v.1 06/06/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0525-00978
Permit Status: Complete
Permit Description: Foundation, Superstructure, Core and Shell Plans for the Exterior Canopy
Date Description Comments
05/15/2025 Please add Building Number to Construction Plan
06/16/2025 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
06/16/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/16/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/16/2025 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/16/2025 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
06/16/2025 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
06/16/2025 Post-Installed Anchor Inspection Report is required.
06/16/2025 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/16/2025 SPECIAL INSPECTION FOR Cold-Formed Steel Deck IS REQUIRED

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0525-00978
Permite Description: Foundation, Superstructure, Core and Shell Plans for the Exterior Canopy
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
05/27/2026 COT - HCBU - Building Above Ceiling N/A Not Applicable
05/27/2026 COT - HCBU - Roof Nailing N/A Not Applicable
05/27/2026 COT - HCEL - Electrical Above Ceiling N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0525-00978
Permit Description: Foundation, Superstructure, Core and Shell Plans for the Exterior Canopy
Total Completed Inspections - 12
Date Description Inspector Results Comments
05/27/2026 ENGR Engineering Final Passed Site for canopy is complete and safe.
05/27/2026 TRSP - ROW - Final/Close-Out Passed
05/27/2026 COT - LCEL - Outdoor Lighting Passed
05/27/2026 COT - HCBU - Excavation/Rebar/Zoning Passed
05/27/2026 COT - HCBU - Framing Passed
05/27/2026 COT - HCBU - Preslab Passed
05/27/2026 COT - HCBU - Stem Wall/Retaining Wall Passed
05/27/2026 COT - HCEL - Electrical Final Passed
05/27/2026 COT - HCEL - Electrical Intermediate Passed
05/27/2026 COT - HCEL - Outdoor Lighting Passed
06/15/2026 COT - FCON - Fire - Final Passed Approved by J. Fordney.
06/15/2026 COT - HCBU - Building Final Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION (SSRS).PDF DOCUMENTS VIEW
TC-COM-0525-00978_TEEN CHALLENGE_63241086_6.9.26 - SIGNED-2026-06-09_V4.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-TCMC CANOPY ASE PH1-3_S02_V2.PDF DOCUMENTS VIEW
SPECINSPECTCERT CANOPY_S02_V1.PDF DOCUMENTS VIEW
TCMC FINAL CD _REV_02-17-2025_S02_V1.PDF DOCUMENTS VIEW
TCMC STRUCTURAL CALCS_S02_V1.PDF DOCUMENTS VIEW