Permit: TC-COM-0525-00927
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2150 N ALVERNON WY
Address NEW:
2150 N ALVERNON WY
Apply Date:
05/06/2025
Applicant:
Description:
Redesign of entry and ticketing area
Permit Reviews
Permit Number - TC-COM-0525-00927
Permit Status: Complete
Permit Description: Redesign of entry and ticketing area
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/12/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 06/03/2025 | REQUIRES RESUBMIT |
| 10/03/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/03/2025 | REQUIRES RESUBMIT |
| 06/03/2025 | COMMERCIAL REVIEW - LIMITED v.3 | 06/04/2025 | APPROVED |
| 06/03/2025 | COMMERCIAL REVIEW - LIMITED v.2 | 06/03/2025 | REQUIRES RESUBMIT |
| 06/04/2025 | RESTAMP - COMMERCIAL v.1 | 06/04/2025 | APPROVED |
| 10/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 10/06/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0525-00927
Permit Status: Complete
Permit Description: Redesign of entry and ticketing area
| Date | Description | Comments |
|---|---|---|
| 06/04/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 10/03/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 05/12/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 06/04/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 06/04/2025 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 06/04/2025 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 06/04/2025 | Masonry Inspection Report submittal review is required. | |
| 06/04/2025 | Post-Installed Anchor Inspection Report is required. | |
| 06/04/2025 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0525-00927
Permit Description: Redesign of entry and ticketing area
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2025 | COT - HCEL - Electrical Intermediate | Passed | ||
| 07/25/2025 | COT - HCME - Mechanical Above Ceiling | Passed | 7-25-25: mechanical above ceiling approved | |
| 08/05/2025 | COT - HCBU - Interior Shear Bracing | Passed | 8-5-25: interior shear bracing approved. | |
| 08/06/2025 | COT - HCBU - Building Above Ceiling | Passed | inspected all shear walls for second layer and nailing ok to cover | |
| 08/08/2025 | COT - HCBU - Framing | Passed | ||
| 08/08/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 08/08/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 08/11/2025 | COT - HCBU - Roof Nailing | Passed | Tongue and groove placement with OSB and metal,roofing over exit area. | |
| 08/11/2025 | COT - HCME - Mechanical Intermediate | Passed | Cut through duct at 10” x 24” into office area. | |
| 08/11/2025 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 08/11/2025 | COT - HCBU - Preslab | Passed | ||
| 08/20/2025 | COT - HCBU - Masonry Pregrout | Passed | ||
| 09/10/2025 | COT - HCME - Mechanical Final | Passed | ||
| 09/16/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 09/18/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 09/18/2025 | COT - FCON - Fire - Final | Passed | ||
| 09/25/2025 | COT - HCEL - Electrical Final | Passed | ||
| 09/25/2025 | COT - LCEL - Outdoor Lighting | Passed | ||
| 09/25/2025 | ENGR Engineering Final | Passed | Site is safe and accessible. | |
| 09/25/2025 | COT - HCBU - Building Final | Passed |