Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0524-01045
Permit Details
Apply Date:
05/30/2024
Applicant:
Stockton Harker
Description:
TI: Edward Jones Office
Permit Reviews
Permit Number - TC-COM-0524-01045
Permit Status: In review
Permit Description: TI: Edward Jones Office
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/05/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 06/18/2024 | REQUIRES RESUBMIT |
07/17/2024 | COMMERCIAL REVIEW - LIMITED v.2 | 07/24/2024 | APPROVED |
07/24/2024 | RESTAMP - COMMERCIAL v.1 | 07/25/2024 | APPROVED |
12/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TC-COM-0524-01045
Permit Status: In review
Permit Description: TI: Edward Jones Office
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
07/24/2024 | AIR BALANCING REPORT IS REQUIRED. |
07/24/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
07/24/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
07/24/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
07/24/2024 | Post-Installed Anchor Inspection Report is required. |
07/24/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0524-01045
Permit Status: In review
Permit Description: TI: Edward Jones Office
Date | Description | Comments |
---|---|---|
06/05/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: In Review
Permit Number: TC-COM-0524-01045
Permite Description: TI: Edward Jones Office
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/25/2024 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | Electrical boxes and emc cabling is roughed in metal framed walls. Okay to proceed with drywall installation on both sides of walls that have no trenches and one side walls that have electrical trenches, until concrete is poured back. |
11/05/2024 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | hard lids. and entry lights. |
11/05/2024 | COT - HCME - Mechanical Above Ceiling | N/A | Not Ready |
Completed Inspections
Permit Status: In Review
Permit Number: TC-COM-0524-01045
Permit Description: TI: Edward Jones Office
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/04/2024 | COT - HCBU - Framing | Passed | ||
10/07/2024 | COT - HCPL - Rough Soil | Passed | ||
10/17/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
10/17/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
11/26/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
11/26/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
11/26/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
11/26/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
11/26/2024 | COT - HCPL - Plumbing Above Ceiling | Passed |