Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0524-00927
Permit Details
Apply Date:
05/15/2024
Applicant:
Dennis Caldwell
Description:
PAIN INSTITUTE: Tenant improvement to an existing commercial building. The building is to remain as it with no square footage added. The use will be medical office.
Permit Reviews
Permit Number - TC-COM-0524-00927
Permit Status: Issued
Permit Description: PAIN INSTITUTE: Tenant improvement to an existing commercial building. The building is to remain as it with no square footage added. The use will be medical office.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/21/2024 | COMMERCIAL REVIEW - FULL v.2 | 06/24/2024 | APPROVED |
05/17/2024 | COMMERCIAL REVIEW - FULL v.1 | 06/20/2024 | REQUIRES RESUBMIT |
06/24/2024 | RESTAMP - COMMERCIAL v.1 | 06/25/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0524-00927
Permit Status: Issued
Permit Description: PAIN INSTITUTE: Tenant improvement to an existing commercial building. The building is to remain as it with no square footage added. The use will be medical office.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
06/18/2024 | AIR BALANCING REPORT IS REQUIRED. |
06/18/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0524-00927
Permite Description: PAIN INSTITUTE: Tenant improvement to an existing commercial building. The building is to remain as it with no square footage added. The use will be medical office.
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/27/2024 | COT - LCEL - Electrical Progress | N/A | Partial Pass | Phase Two. |
09/10/2024 | COT - LCEL - Electrical Above Ceiling | N/A | Partial Pass | Phase One |
07/29/2024 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | Phase One. |
09/09/2024 | COT - LCPL - Plumbing Intermediate | N/A | Partial Pass | 9/9/24: partial for phase 1 in wall plumbing and above ceiling okay to cover. |
09/11/2024 | COT - LCPL - Rough Soil | N/A | Not Applicable |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0524-00927
Permit Description: PAIN INSTITUTE: Tenant improvement to an existing commercial building. The building is to remain as it with no square footage added. The use will be medical office.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/11/2024 | COT - LCEL - Electrical Intermediate | Passed | Phase Two. | |
09/11/2024 | COT - LCPL - Plumbing Intermediate | Passed |