Permit: TC-COM-0524-00797
Permit Details
Apply Date:
05/06/2024
Applicant:
Melbourne Ames
Description:
ALONGSIDE STUDIO - Tenant improvement to an existing commercial building. The building will remain the same with no additional square footage added. The use will be 'personal service' tenant will be performing exercise room service.
Permit Reviews
Permit Number - TC-COM-0524-00797
Permit Status: Complete
Permit Description: ALONGSIDE STUDIO - Tenant improvement to an existing commercial building. The building will remain the same with no additional square footage added. The use will be 'personal service' tenant will be performing exercise room service.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/08/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 05/24/2024 | APPROVED |
09/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/24/2024 | APPROVED |
08/28/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/29/2024 | APPROVED |
08/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/29/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0524-00797
Permit Status: Complete
Permit Description: ALONGSIDE STUDIO - Tenant improvement to an existing commercial building. The building will remain the same with no additional square footage added. The use will be 'personal service' tenant will be performing exercise room service.
Date | Description | Comments |
---|---|---|
05/23/2024 | AIR BALANCING REPORT IS REQUIRED. | |
09/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
05/23/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0524-00797
Permite Description: ALONGSIDE STUDIO - Tenant improvement to an existing commercial building. The building will remain the same with no additional square footage added. The use will be 'personal service' tenant will be performing exercise room service.
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/12/2024 | COT - HCPL - Rough Soil | N/A | Not Ready | |
08/23/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0524-00797
Permit Description: ALONGSIDE STUDIO - Tenant improvement to an existing commercial building. The building will remain the same with no additional square footage added. The use will be 'personal service' tenant will be performing exercise room service.
Total Completed Inspections - 16
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/10/2024 | COT - LCPL - Rough Soil | Passed | ||
06/13/2024 | COT - HCPL - Rough Soil | Passed | ||
06/13/2024 | COT - LCBU - Preslab | Passed | ||
06/24/2024 | COT - LCBU - Framing | Passed | ||
07/30/2024 | COT - LCEL - Electrical Intermediate | Passed | ||
07/30/2024 | COT - LCPL - Plumbing Intermediate | Passed | ||
08/08/2024 | BULD - Electrical Clearance | Passed | Ok to set meter and energize system | |
08/23/2024 | COT - LCEL - Electrical Final | Passed | ||
08/23/2024 | COT - LCME - Mechanical Final | Passed | ||
08/23/2024 | COT - LCEL - Electrical Above Ceiling | Passed | ||
08/23/2024 | COT - LCME - Mechanical Intermediate | Passed | ||
08/23/2024 | COT - FCON - Fire - Final | Passed | ||
08/23/2024 | ENGR Engineering Final | Passed | On this TI permit engineering has nothing, please understand that there is a full Development Plan associated with this project that engendering will have to approve prior to the tenant moving into the space. | |
08/28/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
08/29/2024 | COT - LCBU - Building Final | Passed | 8/26/24: hardware at toilets must be on accessible side, knee guards at lav must be installed at time of final, dispensers must be located within 24"-36" from rear wall at bathroom, 90 degree fitting at A/C condensate. Provide egress label door must remain open during business hours, properly secure electrical whip at A/C unit, Properly coat disconnect stand at roof. 8/29/24: Ok for CofO |
|
08/29/2024 | COT - LCPL - Plumbing Final | Passed | 8/26/24: hardware at toilets must be on accessible side, knee guards at lav must be installed at time of final, dispensers must be located within 24"-36" from rear wall at bathroom, 90 degree fitting at A/C condensate. Provide egress label door must remain open during business hours, properly secure electrical whip at A/C unit, Properly coat disconnect stand at roof. 8/29/24: Ok for CofO |