Permit: TC-COM-0524-00795
Permit Details
Apply Date:
05/03/2024
Applicant:
Jacob Shadaram
Description:
tenant improvement as required for a complete restaurant project. project is within an existing shell as well as providing a new roof beneath existing exterior patio. New underground and in-wall plumbing, mechanical and electrical work with interior slab infill and patio roof and minor structural TI work
Permit Reviews
Permit Number - TC-COM-0524-00795
Permit Status: Issued
Permit Description: tenant improvement as required for a complete restaurant project. project is within an existing shell as well as providing a new roof beneath existing exterior patio. New underground and in-wall plumbing, mechanical and electrical work with interior slab infill and patio roof and minor structural TI work
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/08/2024 | COMMERCIAL REVIEW - FULL v.1 | 06/10/2024 | REQUIRES RESUBMIT |
07/03/2024 | COMMERCIAL REVIEW - FULL v.2 | 08/02/2024 | APPROVED |
08/02/2024 | RESTAMP - COMMERCIAL v.1 | 08/07/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0524-00795
Permit Status: Issued
Permit Description: tenant improvement as required for a complete restaurant project. project is within an existing shell as well as providing a new roof beneath existing exterior patio. New underground and in-wall plumbing, mechanical and electrical work with interior slab infill and patio roof and minor structural TI work
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
07/16/2024 | AIR BALANCING REPORT IS REQUIRED. |
07/16/2024 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
Conditions
Permit Number - TC-COM-0524-00795
Permit Status: Issued
Permit Description: tenant improvement as required for a complete restaurant project. project is within an existing shell as well as providing a new roof beneath existing exterior patio. New underground and in-wall plumbing, mechanical and electrical work with interior slab infill and patio roof and minor structural TI work
Date | Description | Comments |
---|---|---|
05/08/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0524-00795
Permite Description: tenant improvement as required for a complete restaurant project. project is within an existing shell as well as providing a new roof beneath existing exterior patio. New underground and in-wall plumbing, mechanical and electrical work with interior slab infill and patio roof and minor structural TI work
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/30/2024 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | Need to complete connection of exterior. on ding to interior panels. |
09/25/2024 | COT - HCBU - Framing | N/A | Partial Pass | 9/25/24: ok to onside framing partial pass pending bar and sushi bar area. Utility room framing not ready. |
10/10/2024 | COT - HCME - Mechanical Above Ceiling | N/A | Partial Pass | 10/10/24: partial above ceiling for mechanical hard duct. Ok to proceed with flex duct. |
10/18/2024 | COT - HCPL - Gas Pressure Test | N/A | Partial Pass | Partial pass. From meter to Gas line at back cook area the tees off to water heater room. Pending outside patio for space heaters. 10/18/2024 |
11/04/2024 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | 11/4/24: mechanical intermediate at hard lid areas passed ok to proceed. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0524-00795
Permit Description: tenant improvement as required for a complete restaurant project. project is within an existing shell as well as providing a new roof beneath existing exterior patio. New underground and in-wall plumbing, mechanical and electrical work with interior slab infill and patio roof and minor structural TI work
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/30/2024 | COT - HCPL - Rough Soil | Passed | ||
08/30/2024 | COT - HCBU - Preslab | Passed | Vapor barrier and #3 rebar in place. Ok to place concrete in progress areas. | |
09/06/2024 | COT - HCPL - Sewer | Passed | 9/6/24: Grease Interceptor/HCS connection made and under test. Ok to backfill shading required. | |
09/25/2024 | COT - HCPL - Backwater Valve | Passed | ||
10/18/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
10/18/2024 | COT - HCME - Venting | Passed | ||
10/18/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
10/18/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
10/18/2024 | COT - HCPL - Plumbing Progress | Passed | ||
11/04/2024 | COT - HCBU - Building Progress | Passed | ||
11/04/2024 | COT - HCME - Mechanical Progress | Passed | ||
11/04/2024 | COT - HCEL - Electrical Progress | Passed |