Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
05/03/2024
Applicant:
Kelly Rehm
Description:
The Precision Toyota Building 1 PV System is 311.0kW DC, consisting of 622 modules mounted on the existing roof using a ballasted racking system. Grid-tied inverters will supply power through an existing TEP service (meter # 154496604).

Permit Reviews

Permit Number - TC-COM-0524-00793
Permit Status: Complete
Permit Description: The Precision Toyota Building 1 PV System is 311.0kW DC, consisting of 622 modules mounted on the existing roof using a ballasted racking system. Grid-tied inverters will supply power through an existing TEP service (meter # 154496604).
Start Date Submittal Complete Date Status  
05/06/2024 COMMERCIAL REVIEW - FULL v.1 06/06/2024 REQUIRES RESUBMIT Review Details
08/29/2024 COMMERCIAL REVIEW - FULL v.1 09/12/2024 APPROVED Review Details
06/06/2024 COMMERCIAL REVIEW - FULL v.2 06/11/2024 APPROVED Review Details
06/11/2024 RESTAMP - COMMERCIAL v.1 06/11/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0524-00793
Permite Description: The Precision Toyota Building 1 PV System is 311.0kW DC, consisting of 622 modules mounted on the existing roof using a ballasted racking system. Grid-tied inverters will supply power through an existing TEP service (meter # 154496604).
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/23/2024 COT - CSOL - Electrical Progress Solar Project N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0524-00793
Permit Description: The Precision Toyota Building 1 PV System is 311.0kW DC, consisting of 622 modules mounted on the existing roof using a ballasted racking system. Grid-tied inverters will supply power through an existing TEP service (meter # 154496604).
Total Completed Inspections - 7
Date Description Inspector Results Comments
09/23/2024 COT - CSOL - Electrical Final Solar Project Passed
09/23/2024 COT - LCBU - Building Final Passed
09/23/2024 COT - LCEL - Electrical Final Passed
09/23/2024 ENGR Engineering Final Passed
09/24/2024 TRSP - ROW - Final/Close-Out Passed
09/23/2024 COT - CSOL - Grounding/Bonding Solar Project Passed
09/23/2024 BULD - Electrical Clearance Passed Approved solar - DGC Clearance to TEP is required for the solar meter (Bldg 1, meter #154496604)

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PRECISION TOYOTA BLDG 1 PV 311.0KW - REV 1 DRAWINGS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PRECISION TOYOTA BLDG 1 PV 311.0KW - DRAWINGS - RFC_V2.PDF DOCUMENTS VIEW
SIEMENS GFI BREAKER_V1.PDF DOCUMENTS VIEW
SIEMENS GFI BREAKER_V1.PDF DOCUMENTS VIEW