Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0523-01384
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
6202 E BROADWAY BL
Address NEW:
6202 E BROADWAY BL
Apply Date:
05/25/2023
Applicant:
Michael Malone
Description:
Tenant Improvement -
Permit Reviews
Permit Number - TC-COM-0523-01384
Permit Status: Complete
Permit Description: Tenant Improvement -
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/18/2024 | REQUIRES RESUBMIT |
| 08/02/2023 | COMMERCIAL REVIEW - FULL v.3 | 08/03/2023 | APPROVED |
| 08/03/2023 | RESTAMP - COMMERCIAL v.1 | 08/03/2023 | APPROVED |
| 04/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 04/22/2024 | APPROVED |
| 05/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/16/2024 | APPROVED |
| 05/26/2023 | COMMERCIAL REVIEW - FULL v.1 | 06/27/2023 | REQUIRES RESUBMIT |
| 07/11/2023 | COMMERCIAL REVIEW - FULL v.2 | 07/19/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0523-01384
Permit Status: Complete
Permit Description: Tenant Improvement -
| Date | Description | Comments |
|---|---|---|
| 07/18/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
| 04/22/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 03/20/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0523-01384
Permite Description: Tenant Improvement -
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/28/2023 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | 12/28/23: First lift at 4' per plan ok to grout and proceed. |
| 02/02/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Not Applicable | Not applicable for this project. |
| 01/09/2024 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | Kitchen walls. |
| 02/02/2024 | COT - HCME - Mechanical Above Ceiling | N/A | Not Applicable | Not required, contractor is using existing hvac duct work and only replacing dirty registers with new registers in grid ceiling. |
| 02/02/2024 | COT - HCME - Mechanical Intermediate | N/A | Not Applicable | Not required, contractor is using existing hvac duct work and only replacing dirty registers with new registers in grid ceiling. |
| 02/02/2024 | COT - HCME - Venting | N/A | Not Applicable | Not required, existing ventilation not touched during this project. |
| 01/09/2024 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | Kitchen walls. |
| 03/12/2024 | COT - FCON - Sprinkler - Final | N/A | Not Applicable | |
| 03/12/2024 | ENGR Engineering Final | N/A | Not Ready | As per plan all ADA spaces must meet the 2018 codes, this includes signs being at 7’ above a walkable surface. 1 van accessible sign needs to be added to the right side space. Both spaces now are out of compliance due to grade. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0523-01384
Permit Description: Tenant Improvement -
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2023 | COT - HCBU - Stem Wall/Retaining Wall | Passed | Footing for 8' retaining wall is properly dug, rebar reinforcement is installed and properly supported off of ground per plans. Okay to proceed with concrete pour. | |
| 01/03/2024 | COT - HCBU - Masonry Pregrout | Passed | 1-3-2024: Second lift at 8' per plan. Okay to proceed with grout to the top of wall. | |
| 01/09/2024 | COT - HCPL - Gas Pressure Test | Passed | ||
| 01/09/2024 | COT - HCBU - Preslab | Passed | ||
| 02/02/2024 | COT - HCBU - Building Above Ceiling | Passed | Mechanical, plumbing, and Electrical rough-in is complete above ceiling. Okay to proceed with installation of ceiling tiles in grid ceiling. | |
| 02/02/2024 | COT - HCBU - Framing | Passed | Grid ceiling framing is complete, this is the only framing on this project. | |
| 02/02/2024 | COT - HCBU - Building Progress | Passed | Kitchen area plumbing, mechanical, and electrical rough-in for new soup kettles is complete. Finish work is being performed on setting area bench backs. Serving lines cooler is being connected and tested. Grid ceiling framing is complete in kitchen area with lights and registers installed. | |
| 02/02/2024 | COT - HCEL - Electrical Above Ceiling | Passed | Electrical rough-in is complete for lighting above ceiling. Okay to proceed with installation of ceiling tiles in grid ceiling. | |
| 02/02/2024 | COT - HCEL - Electrical Intermediate | Passed | 2/2/24: Electrical rough-in is complete for lighting, receptacles, and food service counters. | |
| 02/02/2024 | COT - HCPL - Plumbing Intermediate | Passed | 2/2/24: Plumbing rough-in is complete for new soup kettles in kitchen. | |
| 03/12/2024 | COT - HCEL - Electrical Final | Passed | ||
| 03/12/2024 | COT - HCME - Mechanical Final | Passed | ||
| 03/12/2024 | COT - HCPL - Gas Final | Passed | ||
| 03/12/2024 | COT - HCPL - Plumbing Final | Passed | ||
| 03/12/2024 | BULD - Electrical Clearance | Passed | No clearance required, currently under electric service. | |
| 03/12/2024 | COT - BULD - SWG Clearance | Passed | ||
| 03/12/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 03/15/2024 | COT - HCBU - Building Final | Passed | Cancelled per Superintendent Steve, not ready for final inspection need to make repairs to parking lot for engineering and replace missing escutcheon on sprinkler heads for fire approvals. | |
| 03/15/2024 | COT - FCON - Fire - Final | Passed | ||
| 03/19/2024 | COT - HCBU - TCO | Passed | 3/19/24: okay for TCO | |
| 04/11/2024 | ENGR Engineering Final | Passed |