Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
05/23/2023
Applicant:
jose ceja
Description:
TENANT IMPROVEMENT TO EXISTING BUILDING, NO ADDED SQUARE FOOTAGE, WORK INCLUDES ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING.

Permit Reviews

Permit Number - TC-COM-0523-01358
Permit Status: Complete
Permit Description: TENANT IMPROVEMENT TO EXISTING BUILDING, NO ADDED SQUARE FOOTAGE, WORK INCLUDES ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING.
Start Date Submittal Complete Date Status  
03/13/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/20/2024 APPROVED Review Details
08/09/2023 COMMERCIAL REVIEW - FULL v.1 08/15/2023 APPROVED Review Details
08/02/2023 RESTAMP - COMMERCIAL v.1 08/03/2023 APPROVED Review Details
07/03/2023 COMMERCIAL REVIEW - FULL v.2 08/02/2023 APPROVED Review Details
09/25/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/25/2023 REQUIRES RESUBMIT Review Details
05/25/2023 COMMERCIAL REVIEW - FULL v.1 06/27/2023 REQUIRES RESUBMIT Review Details
10/09/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 10/10/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-0523-01358
Permit Status: Complete
Permit Description: TENANT IMPROVEMENT TO EXISTING BUILDING, NO ADDED SQUARE FOOTAGE, WORK INCLUDES ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING.
Date Description Comments
08/02/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
03/13/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0523-01358
Permite Description: TENANT IMPROVEMENT TO EXISTING BUILDING, NO ADDED SQUARE FOOTAGE, WORK INCLUDES ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
08/22/2023 COT - HCBU - Building Progress N/A Partial Pass 8/22/23 ok to continue
08/22/2023 COT - HCEL - Electrical Progress N/A Partial Pass 8/22/23 electrical outlets on gypsum board walls need to be grounded everything else looks good
08/22/2023 COT - HCME - Mechanical Progress N/A Partial Pass 8/22/23 Looks good, hangers on hvac secured properly
08/22/2023 COT - HCPL - Plumbing Progress N/A Partial Pass 8/22/23 ok to continue no leaks
08/29/2023 COT - BULD - SWG Clearance N/A Not Applicable 8/29/23: not applicable no gas on site
09/14/2023 COT - HCME - Mechanical Final N/A Not Ready 9/14/23: waiting for air balance report

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0523-01358
Permit Description: TENANT IMPROVEMENT TO EXISTING BUILDING, NO ADDED SQUARE FOOTAGE, WORK INCLUDES ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING.
Total Completed Inspections - 18
Date Description Inspector Results Comments
08/08/2023 COT - HCPL - Rough Soil Passed Partial pass. Looked at water closet and floor sink. 3" pipe Under pressure no leaks. Pending lavatory. Okay to backfill shading required. 8/8/2023
08/22/2023 COT - HCBU - Framing Passed 8/21/23 ok to board up
08/29/2023 BULD - Electrical Clearance Passed TEP ECO
09/07/2023 COT - HCBU - Building Above Ceiling Passed
09/07/2023 COT - HCEL - Electrical Above Ceiling Passed
09/07/2023 COT - HCEL - Grounding/Bonding Passed
09/07/2023 COT - HCME - Venting Passed
09/07/2023 COT - HCPL - Plumbing Above Ceiling Passed
09/14/2023 COT - HCME - Mechanical Above Ceiling Passed
09/15/2023 ENGR Engineering Final Passed
09/14/2023 TRSP - ROW - Final/Close-Out Passed
09/15/2023 COT - HCME - Mechanical Final Passed
09/15/2023 COT - HCPL - Plumbing Final Passed
09/15/2023 COT - HCEL - Electrical Final Passed
09/18/2023 COT - FCON - Fire - Final Passed
09/18/2023 COT - FCON - Sprinkler - Final Passed
09/19/2023 COT - HCBU - Building Final Passed
09/19/2023 COT - HCBU - CofO Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
INNOVATIVE DESIGN - YOGA LOFT LAB RESULTS-2024-03-06_V1.PDF DOCUMENTS VIEW
INNOVATIVE DESIGN - YOGA LOFT LAB RESULTS-2024-03-06_V1.PDF DOCUMENTS VIEW
YOGA LOFT TAB 10.9.2023_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-23056-SET-8-07-2023_V1.PDF DOCUMENTS VIEW
YOGAOLOFT-RESPONSE LETTER-_V1.PDF DOCUMENTS VIEW
YOGAOLOFT-REVISION NARRATIVE-_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-23056-SET-5-23-2023_V1.PDF DOCUMENTS VIEW
CONS-23056-SET-7-02-2023_V1.PDF DOCUMENTS VIEW
CONS-23056-SET-5-23-2023_V1.PDF DOCUMENTS VIEW