Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
1930 E SILVERLAKE RD
Apply Date:
05/12/2023
Applicant:
Erich Schmidt
Description:
Interior improvements to existing Office building

Permit Reviews

Permit Number - TC-COM-0523-01265
Permit Status: Complete
Permit Description: Interior improvements to existing Office building
Start Date Submittal Complete Date Status  
07/31/2023 RESTAMP - COMMERCIAL v.1 08/01/2023 APPROVED Review Details
07/06/2023 COMMERCIAL REVIEW - FULL v.2 07/13/2023 REQUIRES RESUBMIT Review Details
02/13/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/14/2024 APPROVED Review Details
07/19/2023 COMMERCIAL REVIEW - FULL v.3 07/31/2023 APPROVED Review Details
05/16/2023 COMMERCIAL REVIEW - FULL v.1 06/01/2023 REQUIRES RESUBMIT Review Details
02/15/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/27/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0523-01265
Permit Status: Complete
Permit Description: Interior improvements to existing Office building
Date Description Comments
07/31/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
07/31/2023 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
05/16/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
02/14/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0523-01265
Permite Description: Interior improvements to existing Office building
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
10/18/2023 COT - HCBU - Masonry Pregrout N/A Not Applicable
10/18/2023 COT - HCPL - Gas Final N/A Not Applicable
10/18/2023 COT - HCPL - Gas Pressure Test N/A Not Applicable
10/18/2023 COT - BULD - SWG Clearance N/A Not Applicable
10/30/2023 COT - HCME - Mechanical Intermediate N/A Canceled Canceled. Inspection was for drywall nailing. 10/30/2023
10/18/2023 ENGR Engineering Final N/A Partial Pass Walked site with Will Anderson from Goodwill (520) 784-8989 all interior work only no site work on attachments, will review with Dave Roberts.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0523-01265
Permit Description: Interior improvements to existing Office building
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/14/2023 COT - LCPL - Rough Soil Passed 9/13/23: all plumbing per plan ok to backfill
09/20/2023 COT - HCBU - Preslab Passed 9/13/23: all plumbing per plan ok to backfill. Pre slab will be scheduled in the future
9/20/23: preslab passed
10/18/2023 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
10/18/2023 COT - HCBU - Framing Passed
10/18/2023 COT - HCEL - Electrical Intermediate Passed
10/18/2023 COT - HCPL - Plumbing Intermediate Passed
10/20/2023 TRSP - ROW - Final/Close-Out Passed
11/03/2023 COT - HCBU - Interior Shear Bracing Passed
12/29/2023 COT - HCBU - Building Above Ceiling Passed
12/29/2023 COT - HCEL - Electrical Above Ceiling Passed
12/29/2023 COT - HCME - Mechanical Above Ceiling Passed
12/29/2023 COT - HCME - Mechanical Intermediate Passed
12/29/2023 COT - HCPL - Plumbing Above Ceiling Passed
12/29/2023 BULD - Electrical Clearance Passed
02/14/2024 COT - FCON - Sprinkler - Final Passed
02/15/2024 ENGR Engineering Final Passed
02/14/2024 COT - FCON - Fire - Final Passed
02/15/2024 COT - HCPL - Plumbing Final Passed
02/15/2024 COT - HCME - Mechanical Final Passed
02/15/2024 COT - HCEL - Electrical Final Passed
02/16/2024 COT - HCBU - Building Final Passed