Permit: TC-COM-0523-01252
Permit Details
Apply Date:
05/10/2023
Applicant:
Kelly Rehm
Description:
The Camp Lowell Offices is a 15.0 kW DC grid tied PV system - 30 Silfab 500W modules w/ 1 grid-tied inverter Modules go on an EXISTING custom steel structure in the parking lot. The structure was designed for 75 modules, and the construction is under permit TC-COM-0523-01251. Only 30 modules are installed on this permit and are assigned to the electrical service of 3071 N Swan Rd (meter 151509800).
Permit Reviews
Permit Number - TC-COM-0523-01252
Permit Status: Complete
Permit Description: The Camp Lowell Offices is a 15.0 kW DC grid tied PV system - 30 Silfab 500W modules w/ 1 grid-tied inverter
Modules go on an EXISTING custom steel structure in the parking lot.
The structure was designed for 75 modules, and the construction is under permit TC-COM-0523-01251. Only 30 modules are installed on this permit and are assigned to the electrical service of 3071 N Swan Rd (meter 151509800).
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/26/2024 | APPROVED |
| 05/12/2023 | COMMERCIAL REVIEW - FULL v.1 | 06/15/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0523-01252
Permit Status: Complete
Permit Description: The Camp Lowell Offices is a 15.0 kW DC grid tied PV system - 30 Silfab 500W modules w/ 1 grid-tied inverter
Modules go on an EXISTING custom steel structure in the parking lot.
The structure was designed for 75 modules, and the construction is under permit TC-COM-0523-01251. Only 30 modules are installed on this permit and are assigned to the electrical service of 3071 N Swan Rd (meter 151509800).
| Date | Description | Comments |
|---|---|---|
| 06/15/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
| 06/15/2023 | SUBMISSION OF SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS REPORT IS REQUIRED. | |
| 06/15/2023 | SUBMISSION OF SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES REPORT IS REQUIRED. | |
| 06/15/2023 | SUBMISSION OF SPECIAL INSPECTION FOR WELDING REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0523-01252
Permite Description: The Camp Lowell Offices is a 15.0 kW DC grid tied PV system - 30 Silfab 500W modules w/ 1 grid-tied inverter
Modules go on an EXISTING custom steel structure in the parking lot.
The structure was designed for 75 modules, and the construction is under permit TC-COM-0523-01251. Only 30 modules are installed on this permit and are assigned to the electrical service of 3071 N Swan Rd (meter 151509800).
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/04/2023 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for line-side tap, DGL Clearance was called into TEP at 10:10am (meter #151509800) |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0523-01252
Permit Description: The Camp Lowell Offices is a 15.0 kW DC grid tied PV system - 30 Silfab 500W modules w/ 1 grid-tied inverter
Modules go on an EXISTING custom steel structure in the parking lot.
The structure was designed for 75 modules, and the construction is under permit TC-COM-0523-01251. Only 30 modules are installed on this permit and are assigned to the electrical service of 3071 N Swan Rd (meter 151509800).
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2023 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
| 08/07/2023 | COT - LCBU - Framing | Passed | Approved structure per special inspection TC-COM-0523-01251 | |
| 08/17/2023 | COT - LCEL - Electrical Underground | Passed | Approved all underground PV and secondary conduits from the service panel and PV equipment to the Canopy, okay to backfill progress areas | |
| 08/24/2023 | COT - LCBU - Building Final | Passed | ||
| 08/24/2023 | COT - LCEL - Electrical Final | Passed | ||
| 08/24/2023 | BULD - Electrical Clearance | Passed | Approved, DGC/DGL Clearance to TEP is required for the solar meter (meter #151509800) | |
| 08/28/2023 | ENGR Engineering Final | Passed | several ladders and lifts present | |
| 08/28/2023 | COT - LCEL - Grounding/Bonding | Passed |