Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
05/09/2023
Applicant:
Lisa Bowers
Description:
Interior Tenant Improvement Remodel (From Medical Office to Dentist Office)

Permit Reviews

Permit Number - TC-COM-0523-01232
Permit Status: Complete
Permit Description: Interior Tenant Improvement Remodel (From Medical Office to Dentist Office)
Start Date Submittal Complete Date Status  
04/02/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/05/2024 APPROVED Review Details
10/30/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/30/2024 APPROVED Review Details
09/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 09/06/2024 APPROVED Review Details
05/12/2023 COMMERCIAL REVIEW - FULL v.1 06/20/2023 APPROVED Review Details
06/20/2023 RESTAMP - COMMERCIAL v.1 06/23/2023 APPROVED Review Details
09/13/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/16/2024 APPROVED Review Details
02/29/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/01/2024 APPROVED Review Details
07/31/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/31/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0523-01232
Permit Status: Complete
Permit Description: Interior Tenant Improvement Remodel (From Medical Office to Dentist Office)
Date Description Comments
06/20/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
04/02/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/02/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
04/02/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/02/2024 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
09/19/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/19/2024 Separate submittal to PC Industrial Wastewater Control is required for dental offices, dental schools and clinics. Contact Lucinda.Hyatt@pima.gov for review and assessment of compliance with the rules for amalgam separators.
06/20/2023 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
04/02/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0523-01232
Permite Description: Interior Tenant Improvement Remodel (From Medical Office to Dentist Office)
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
10/25/2023 COT - HCBU - Masonry Pregrout N/A Not Applicable
11/22/2023 BULD - Electrical Clearance N/A Not Applicable
11/22/2023 COT - BULD - SWG Clearance N/A Not Applicable
11/21/2023 COT - HCBU - Building Final N/A Partial Pass Partial pending chlorination report, Partial pending air balance report. 11/21/2023

Okay for level 2 TCO.
11/22/2023 COT - HCBU - CofO N/A Partial Pass Awaiting plumbing and mechanical final approvals.
11/22/2023 COT - HCME - Mechanical Final N/A Partial Pass
11/21/2023 COT - HCPL - Plumbing Final N/A Partial Pass Partial pending chlorination report, Partial pending air balance report. 11/21/2023

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0523-01232
Permit Description: Interior Tenant Improvement Remodel (From Medical Office to Dentist Office)
Total Completed Inspections - 24
Date Description Inspector Results Comments
08/25/2023 COT - HCPL - Rough Soil Passed
08/25/2023 COT - HCEL - Electrical Underground Passed
08/28/2023 COT - HCBU - Preslab Passed
10/02/2023 COT - HCBU - Framing Passed Framing, electrical and plumbing rough-in for dental chair area is complete. Okay to proceed with drywall installation, taping and texturing interior walls throughout dental office.
10/02/2023 COT - HCEL - Electrical Intermediate Passed Framing, electrical and plumbing rough-in for dental chair area is complete. Okay to proceed with drywall installation, taping and texturing interior walls throughout dental office.
10/02/2023 COT - HCPL - Plumbing Intermediate Passed Framing, electrical and plumbing rough-in for dental chair area is complete. Okay to proceed with drywall installation, taping and texturing interior walls throughout dental office.
10/25/2023 COT - HCEL - Electrical Above Ceiling Passed
10/25/2023 COT - HCME - Mechanical Above Ceiling Passed
10/25/2023 COT - HCPL - Plumbing Above Ceiling Passed
10/25/2023 COT - HCME - Venting Passed
11/21/2023 COT - HCEL - Electrical Final Passed
11/21/2023 COT - FCON - Fire - Final Passed
11/21/2023 ENGR Engineering Final Passed
11/21/2023 TRSP - ROW - Final/Close-Out Passed
11/22/2023 COT - HCBU - Building Above Ceiling Passed
11/22/2023 COT - HCBU - Building Progress Passed
11/22/2023 COT - HCEL - Electrical Progress Passed
11/22/2023 COT - HCEL - Grounding/Bonding Passed
11/22/2023 COT - HCME - Mechanical Progress Passed
11/22/2023 COT - HCPL - Plumbing Progress Passed
04/19/2024 COT - HCBU - Building Final Passed
04/19/2024 COT - HCBU - CofO Passed
04/19/2024 COT - HCME - Mechanical Final Passed
04/19/2024 COT - HCPL - Plumbing Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
SPAPP-23-071M CAMPBELL DENTAL TI, SP. IN. LTR.-2024-09-13_V1.PDF DOCUMENTS VIEW
23-017M CAMPBELL DENTAL SPL. IN. PACKET-2024-09-05_V1.PDF DOCUMENTS VIEW
CAMPBELL DENTAL WATER REPORT-2024-04-01_V1.PDF DOCUMENTS VIEW
TEST - BALANCE (TC-COM-0523-01232)_V1.PDF DOCUMENTS VIEW
TEST - BALANCE (TC-COM-0523-01232)_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1 - COOLING - HEATING LOAD CALCULATIONS_V1.PDF DOCUMENTS VIEW
1 - STRUCTURAL FINAL CALCULATIONS - CAMPBELL DENTAL_V1.PDF DOCUMENTS VIEW
CONS-1 - FULL CD SET - CAMPBELL DENTAL GROUP (5-9-2023)_V1.PDF DOCUMENTS VIEW
CONS-WILLDAN_APPROVED_PLAN SET_V1.PDF DOCUMENTS VIEW
WILLDAN_APPROVED_STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
CAMPBELL DENTAL GROUP PSA (SIGNED SCS)_V1.PDF DOCUMENTS VIEW