Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0425-00857
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
4044 E SPEEDWAY BL
Address NEW:
4044 E SPEEDWAY BL
Apply Date:
04/29/2025
Applicant:
Kelly Rehm
Description:
The Metro Gnome PV System will consist of 36 Hanwha 435W modules mounted on the existing roof. Grid-tied microinverters will supply power through an existing TEP service. Total system size is 15.66 kW DC.
Permit Reviews
Permit Number - TC-COM-0425-00857
Permit Status: Complete
Permit Description: The Metro Gnome PV System will consist of 36 Hanwha 435W modules mounted on the existing roof. Grid-tied microinverters will supply power through an existing TEP service.
Total system size is 15.66 kW DC.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/29/2025 | COMMERCIAL REVIEW - FULL v.1 | 05/28/2025 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0425-00857
Permit Description: The Metro Gnome PV System will consist of 36 Hanwha 435W modules mounted on the existing roof. Grid-tied microinverters will supply power through an existing TEP service.
Total system size is 15.66 kW DC.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2025 | COT - CSOL - Electrical Final Solar Project | Passed | ||
| 06/23/2025 | COT - LCBU - Building Final | Passed | ||
| 06/23/2025 | COT - FCON - Fire - Final | Passed | ||
| 06/23/2025 | ENGR Engineering Final | Passed | ||
| 06/23/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 06/23/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |