Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
04/22/2025
Applicant:
Dolores Gomez
Description:
Tenant Build out REV1: Add temporary construction power.

Permit Reviews

Permit Number - TC-COM-0425-00808
Permit Status: Complete
Permit Description: Tenant Build out REV1: Add temporary construction power.
Start Date Submittal Complete Date Status  
06/05/2025 RESTAMP - COMMERCIAL v.1 06/09/2025 APPROVED Review Details
06/16/2025 COMMERCIAL REVIEW - FULL REVISION v.1 06/25/2025 REQUIRES RESUBMIT Review Details
05/19/2025 COMMERCIAL REVIEW - LIMITED v.3 05/19/2025 REQUIRES RESUBMIT Review Details
05/16/2025 COMMERCIAL REVIEW - LIMITED v.2 05/16/2025 REQUIRES RESUBMIT Review Details
07/03/2025 COMMERCIAL REVIEW - FULL REVISION v.2 07/08/2025 APPROVED Review Details
05/19/2025 COMMERCIAL REVIEW - LIMITED v.4 06/03/2025 REQUIRES RESUBMIT Review Details
06/03/2025 COMMERCIAL REVIEW - LIMITED v.5 06/05/2025 APPROVED Review Details
07/31/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/04/2025 APPROVED Review Details
04/23/2025 COMMERCIAL REVIEW - LIMITED v.1 05/08/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0425-00808
Permit Status: Complete
Permit Description: Tenant Build out REV1: Add temporary construction power.
Date Description Comments
06/04/2025 AIR BALANCING REPORT IS REQUIRED.
04/23/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
06/04/2025 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0425-00808
Permite Description: Tenant Build out REV1: Add temporary construction power.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
06/23/2025 COT - BULD - SWG Clearance N/A Not Applicable
06/23/2025 COT - FCON - Alarm - Final N/A Not Applicable Tucson Federal Credit Union. No Alarm. Just Sprinkler monitoring in existing shell.
06/11/2025 BULD - Electrical Clearance N/A Re-inspection required 6-11-25: missing metallic address label on main panel.
If you choose to install a temp subpanel then have architect submit a revision showing size , mounting details , location, etc...
07/22/2025 COT - LCBU - Framing N/A Partial Pass 7-22-25: above ceiling & in wall framing approved. Okay to continue construction at progress areas.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0425-00808
Permit Description: Tenant Build out REV1: Add temporary construction power.
Total Completed Inspections - 16
Date Description Inspector Results Comments
06/16/2025 COT - LCPL - Rough Soil Passed 6-16-25: underground plumbing verified under test and per plans-okay to backfill progress areas.
06/23/2025 TRSP - ROW - Final/Close-Out Passed Work completed on private property
06/23/2025 COT - LCPL - Plumbing Intermediate Passed 6/23/25 corrections made
06/23/2025 COT - LCEL - Electrical Underground Passed 6/23/25 passed
07/16/2025 COT - LCEL - Grounding/Bonding Passed 7-16-25: grounding/bonding approved.
07/16/2025 COT - LCEL - Electrical Intermediate Passed 7-16-25: electrical intermediate approved.
07/18/2025 COT - LCPL - Plumbing Final Passed 7-18-25: condensation line on rooftop together with ADA requirements will be verified at finals. Plumbing final approved.
07/24/2025 COT - FCON - Sprinkler - Final Passed
07/24/2025 COT - LCEL - Electrical Above Ceiling Passed 7-24-25: electrical above ceiling approved.
07/24/2025 COT - LCME - Mechanical Intermediate Passed 7-24-25: mechanical intermediate approved.
07/28/2025 COT - LCME - Mechanical Final Passed
07/28/2025 COT - LCEL - Electrical Final Passed
07/28/2025 COT - LCBU - Framing Passed
07/30/2025 ENGR Engineering Final Passed
07/31/2025 COT - LCBU - Building Final Passed
07/31/2025 COT - FCON - Fire - Final Passed