Permit: TC-COM-0425-00808
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
10165 E OLD VAIL RD UNIT 141
Address NEW:
10165 E OLD VAIL RD UNIT 141
Apply Date:
04/22/2025
Applicant:
Dolores Gomez
Description:
Tenant Build out REV1: Add temporary construction power.
Permit Reviews
Permit Number - TC-COM-0425-00808
Permit Status: Complete
Permit Description: Tenant Build out
REV1: Add temporary construction power.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/05/2025 | RESTAMP - COMMERCIAL v.1 | 06/09/2025 | APPROVED |
| 06/16/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 06/25/2025 | REQUIRES RESUBMIT |
| 05/19/2025 | COMMERCIAL REVIEW - LIMITED v.3 | 05/19/2025 | REQUIRES RESUBMIT |
| 05/16/2025 | COMMERCIAL REVIEW - LIMITED v.2 | 05/16/2025 | REQUIRES RESUBMIT |
| 07/03/2025 | COMMERCIAL REVIEW - FULL REVISION v.2 | 07/08/2025 | APPROVED |
| 05/19/2025 | COMMERCIAL REVIEW - LIMITED v.4 | 06/03/2025 | REQUIRES RESUBMIT |
| 06/03/2025 | COMMERCIAL REVIEW - LIMITED v.5 | 06/05/2025 | APPROVED |
| 07/31/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/04/2025 | APPROVED |
| 04/23/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 05/08/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0425-00808
Permit Status: Complete
Permit Description: Tenant Build out
REV1: Add temporary construction power.
| Date | Description | Comments |
|---|---|---|
| 06/04/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 04/23/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 06/04/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0425-00808
Permite Description: Tenant Build out
REV1: Add temporary construction power.
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 06/23/2025 | COT - FCON - Alarm - Final | N/A | Not Applicable | Tucson Federal Credit Union. No Alarm. Just Sprinkler monitoring in existing shell. |
| 06/11/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | 6-11-25: missing metallic address label on main panel. If you choose to install a temp subpanel then have architect submit a revision showing size , mounting details , location, etc... |
| 07/22/2025 | COT - LCBU - Framing | N/A | Partial Pass | 7-22-25: above ceiling & in wall framing approved. Okay to continue construction at progress areas. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0425-00808
Permit Description: Tenant Build out
REV1: Add temporary construction power.
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2025 | COT - LCPL - Rough Soil | Passed | 6-16-25: underground plumbing verified under test and per plans-okay to backfill progress areas. | |
| 06/23/2025 | TRSP - ROW - Final/Close-Out | Passed | Work completed on private property | |
| 06/23/2025 | COT - LCPL - Plumbing Intermediate | Passed | 6/23/25 corrections made | |
| 06/23/2025 | COT - LCEL - Electrical Underground | Passed | 6/23/25 passed | |
| 07/16/2025 | COT - LCEL - Grounding/Bonding | Passed | 7-16-25: grounding/bonding approved. | |
| 07/16/2025 | COT - LCEL - Electrical Intermediate | Passed | 7-16-25: electrical intermediate approved. | |
| 07/18/2025 | COT - LCPL - Plumbing Final | Passed | 7-18-25: condensation line on rooftop together with ADA requirements will be verified at finals. Plumbing final approved. | |
| 07/24/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 07/24/2025 | COT - LCEL - Electrical Above Ceiling | Passed | 7-24-25: electrical above ceiling approved. | |
| 07/24/2025 | COT - LCME - Mechanical Intermediate | Passed | 7-24-25: mechanical intermediate approved. | |
| 07/28/2025 | COT - LCME - Mechanical Final | Passed | ||
| 07/28/2025 | COT - LCEL - Electrical Final | Passed | ||
| 07/28/2025 | COT - LCBU - Framing | Passed | ||
| 07/30/2025 | ENGR Engineering Final | Passed | ||
| 07/31/2025 | COT - LCBU - Building Final | Passed | ||
| 07/31/2025 | COT - FCON - Fire - Final | Passed |