Permit: TC-COM-0425-00790
Permit Details
Apply Date:
04/18/2025
Applicant:
Amber Guerrero
Description:
Remove and Replace compressor and air tank servicing aeration to the lake
Permit Reviews
Permit Number - TC-COM-0425-00790
Permit Status: Complete
Permit Description: Remove and Replace compressor and air tank servicing aeration to the lake
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/14/2025 | RESTAMP - COMMERCIAL v.1 | 07/14/2025 | APPROVED |
| 04/22/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 05/08/2025 | REQUIRES RESUBMIT |
| 07/07/2025 | COMMERCIAL REVIEW - LIMITED v.3 | 07/14/2025 | APPROVED |
| 06/20/2025 | COMMERCIAL REVIEW - LIMITED v.2 | 06/20/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0425-00790
Permit Status: Complete
Permit Description: Remove and Replace compressor and air tank servicing aeration to the lake
| Date | Description | Comments |
|---|---|---|
| 07/09/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0425-00790
Permite Description: Remove and Replace compressor and air tank servicing aeration to the lake
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2025 | COT - LCME - Mechanical Intermediate | N/A | Not Applicable | |
| 08/22/2025 | COT - FCON - Fire - Final | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0425-00790
Permit Description: Remove and Replace compressor and air tank servicing aeration to the lake
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2025 | COT - LCBU - Building Final | Passed | ||
| 08/22/2025 | COT - LCEL - Electrical Final | Passed | ||
| 08/22/2025 | COT - LCME - Mechanical Final | Passed | ||
| 08/22/2025 | ENGR Engineering Final | Passed | ||
| 08/22/2025 | TRSP - ROW - Final/Close-Out | Passed | Work completed outside of city right of way |