Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Address NEW:
3823 E SPEEDWAY BL
Apply Date:
04/16/2025
Applicant:
Brenda Olsson
Description:
New 200 amp, 3 phase service (2) 40 amp circuits for dual port EV chargers REV 1: Revised drawings include adding another dual port EV charger, for a total of (2) dual port chargers.

Permit Reviews

Permit Number - TC-COM-0425-00775
Permit Status: Issued
Permit Description: New 200 amp, 3 phase service (2) 40 amp circuits for dual port EV chargers REV 1: Revised drawings include adding another dual port EV charger, for a total of (2) dual port chargers.
Start Date Submittal Complete Date Status  
07/16/2025 COMMERCIAL PDSD SIMPLE REVIEW REVISION v.1 07/17/2025 APPROVED Review Details
08/21/2025 RESTAMP - COMMERCIAL v.1 08/28/2025 APPROVED Review Details
04/16/2025 COMMERCIAL PDSD SIMPLE REVIEW v.1 04/18/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0425-00775
Permit Status: Issued
Permit Description: New 200 amp, 3 phase service (2) 40 amp circuits for dual port EV chargers REV 1: Revised drawings include adding another dual port EV charger, for a total of (2) dual port chargers.
Date Description Comments
04/16/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0425-00775
Permite Description: New 200 amp, 3 phase service (2) 40 amp circuits for dual port EV chargers REV 1: Revised drawings include adding another dual port EV charger, for a total of (2) dual port chargers.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/20/2025 COT - LCEL - Grounding/Bonding N/A Partial Pass Partial pass for ground rods.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0425-00775
Permit Description: New 200 amp, 3 phase service (2) 40 amp circuits for dual port EV chargers REV 1: Revised drawings include adding another dual port EV charger, for a total of (2) dual port chargers.
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/20/2025 COT - LCEL - Electrical Underground Passed Okay to backfill, metallic marker tape required 12" below grade.
09/02/2025 BULD - Electrical Clearance Passed Approved new 200A 3-phase service panel - ECO Clearance to TEP is required
Pending EV charger final
12/17/2025 COT - LCEL - Electrical Final Passed

Documents

File Name Document Type  
CONS-CONS-VARSITY CLUBS EV CHGR DRAWINGS_REV2_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REVISED ADDRESS NARRATIVE_V1.PDF DOCUMENTS VIEW
VARSITY CLUBS EV CHGR PIMA MAPS_3823_V1.PDF DOCUMENTS VIEW
VARSITY CLUBS EV CHGR SITE PLAN_3823_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-VARSITY CLUBS EV CHARGER_REV1_1_V1.PDF DOCUMENTS VIEW
REVISED DRAWING NARRATIVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-VARSITY CLUBS EV CHGR DRAWINGS_V1.PDF DOCUMENTS VIEW