Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
04/14/2025
Applicant:
Amy Cotner
Description:
Speculative TI buildout in unoccupied Shell under separate permit.

Permit Reviews

Permit Number - TC-COM-0425-00745
Permit Status: Complete
Permit Description: Speculative TI buildout in unoccupied Shell under separate permit.
Start Date Submittal Complete Date Status  
06/11/2025 RESTAMP - COMMERCIAL v.1 06/23/2025 APPROVED Review Details
06/06/2025 COMMERCIAL REVIEW - FULL v.2 06/11/2025 APPROVED Review Details
05/11/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/12/2026 APPROVED Review Details
04/16/2025 COMMERCIAL REVIEW - FULL v.1 05/08/2025 REQUIRES RESUBMIT Review Details
03/25/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/06/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0425-00745
Permit Status: Complete
Permit Description: Speculative TI buildout in unoccupied Shell under separate permit.
Date Description Comments
04/16/2025 BLDG 2 UNIT 2190 Needs to be added to cover sheet as part of the address to reflect this permit application.
04/16/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
04/16/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0425-00745
Permite Description: Speculative TI buildout in unoccupied Shell under separate permit.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
11/18/2025 COT - HCME - Mechanical Progress N/A Partial Pass 11-18-25: pookie joint for above ceiling mechanical approved.
11/12/2025 COT - HCPL - Plumbing Progress N/A Partial Pass 11-12-25: Verified rough in & wall supports for domestic & DWV. Okay to continue w TI at progress areas.
11/12/2025 COT - HCEL - Electrical Progress N/A Partial Pass 11-12-25: in wall rough in electrical verified per plans. Okay to continue with TI at progress areas.
02/18/2026 COT - BULD - SWG Clearance N/A Not Applicable 2-18-26: not applicable.
12/19/2025 COT - HCBU - Framing N/A Partial Pass 12-19-25: interior framing at office space approved-okay to continue with construction at progress areas.
11/25/2025 COT - HCBU - Building Progress N/A Partial Pass Partial pass. Screw inspection on office demising walls facing towards the warehouse. Okay to tape and mud. 11/25/2025
02/18/2026 ENGR Engineering Final N/A Not Ready Suite numbers are not posted, recall inspection once suite numbers are up.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0425-00745
Permit Description: Speculative TI buildout in unoccupied Shell under separate permit.
Total Completed Inspections - 23
Date Description Inspector Results Comments
02/18/2026 COT - HCME - Mechanical Progress Passed 2-18-26: approved.
02/18/2026 COT - HCPL - Plumbing Progress Passed 2-18-26: approved.
02/18/2026 COT - HCEL - Electrical Progress Passed 2-18-26: approved.
02/23/2026 COT - HCPL - Plumbing Intermediate Passed
02/23/2026 COT - HCBU - Framing Passed
02/23/2026 COT - HCEL - Electrical Intermediate Passed
03/05/2026 BULD - Electrical Clearance Passed 3-5-26: okay to energize Suite 2190-panel #2. INCR Clearance issued to TEP.
03/11/2026 COT - HCME - Mechanical Above Ceiling Passed 3-11-26: approved.
03/11/2026 COT - HCME - Mechanical Intermediate Passed 3-11-26: approved.
03/11/2026 COT - HCPL - Plumbing Above Ceiling Passed 3-11-26: approved.
03/11/2026 COT - HCEL - Electrical Above Ceiling Passed 3-11-26: approved.
04/20/2026 COT - FCON - Fire - Final Passed
04/20/2026 COT - FCON - Alarm - Final Passed
04/20/2026 COT - HCBU - Building Progress Passed 4-20-26: approved. Schedule Building finals.
04/23/2026 COT - FCON - Sprinkler - Final Passed
04/27/2026 TRSP - ROW - Final/Close-Out Passed
04/27/2026 ENGR Engineering Final Passed Site is safe and complete in accordance with approved plans.
04/30/2026 COT - HCPL - Plumbing Final Passed 4-30-26: plumbing final approved.
04/30/2026 COT - HCBU - Building Above Ceiling Passed 4-30-26: building above ceiling approved.
05/05/2026 COT - HCEL - Electrical Final Passed 5-5-26: electrical final
05/07/2026 COT - HCME - Mechanical Final Passed 5-7-26: mechanical final approved.
05/11/2026 COT - HCBU - Building Final Passed 5-11-26: building final approved.
05/11/2026 COT - HCBU - CofO Passed 5-11-26: building final approved & Conditions satisfied. Okay to apply for C of O.

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL (SSRS).PDF DOCUMENTS VIEW
26C0512_1 TURNER 03 20 2026 1235-2026-05-08_V1.PDF DOCUMENTS VIEW
DREXEL COMMERCE CENTER SUITE 2190 - TAB REPORT_V1.PDF DOCUMENTS VIEW
DREXEL TORQUE03232026_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-DREXEL CC TI BUILDING 2 - SUITE 2190_V2.PDF DOCUMENTS VIEW
COMCHECK-SUITE 2190 - VLMK SIGNED_V2.PDF DOCUMENTS VIEW
DREXEL CC TI STRUCTURAL CALCULATIONS_SEALED_V2.PDF DOCUMENTS VIEW