Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
04/14/2025
Applicant:
Amy Cotner
Description:
Speculative TI buildout in unoccupied Shell under separate permit.

Permit Reviews

Permit Number - TC-COM-0425-00734
Permit Status: Inspections
Permit Description: Speculative TI buildout in unoccupied Shell under separate permit.
Start Date Submittal Complete Date Status  
04/16/2025 COMMERCIAL REVIEW - FULL v.1 05/08/2025 REQUIRES RESUBMIT Review Details
06/06/2025 COMMERCIAL REVIEW - FULL v.2 06/10/2025 APPROVED Review Details
06/10/2025 RESTAMP - COMMERCIAL v.1 06/23/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0425-00734
Permit Status: Inspections
Permit Description: Speculative TI buildout in unoccupied Shell under separate permit.
Date Description Comments
04/16/2025 BLDG 1 UNIT 1130 Needs to be added to cover sheet as part of the address to reflect this permit application.
04/16/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
07/02/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0425-00734
Permite Description: Speculative TI buildout in unoccupied Shell under separate permit.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
11/17/2025 COT - HCPL - Plumbing Progress N/A Partial Pass 11-17-25: underground plumbing verified per plans. Okay to backfill-shading required.
Note: schedule a dowel & vapor barrier inspection prior to pour back.
11/25/2025 COT - HCBU - Framing N/A Partial Pass Partial pass. Framing inspection on gridline 7. East end of building approved. Okay to proceed progress areas. 11/25/2025
12/05/2025 COT - HCEL - Electrical Progress N/A Partial Pass 12-5-25: in wall electrical at demising wall verified per plans. Okay to continue with TI at progress areas.
12/09/2025 COT - HCBU - Building Progress N/A Partial Pass 12-9-25: partial pass for drywall screw inspection on south side of demising wall. Remaining section of demising wall not yet installed. Okay to tape & texture progress areas.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-DREXEL CC TI BUILDING 1 - SUITE 1130_V2.PDF DOCUMENTS VIEW
COMCHECK-SUITE 1130 - VLMK SIGNED_V2.PDF DOCUMENTS VIEW
DREXEL CC TI STRUCTURAL CALCULATIONS_SEALED_V2.PDF DOCUMENTS VIEW