Permit: TC-COM-0425-00731
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2730 E DREXEL RD BLDG 1 UNIT 1110
Address NEW:
2730 E DREXEL RD BLDG 1 UNIT 1110
Apply Date:
04/14/2025
Applicant:
Amy Cotner
Description:
Speculative TI buildout in unoccupied Shell under separate permit.
Permit Reviews
Permit Number - TC-COM-0425-00731
Permit Status: Complete
Permit Description: Speculative TI buildout in unoccupied Shell under separate permit.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/15/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/19/2026 | APPROVED |
| 05/20/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/21/2026 | APPROVED |
| 06/10/2025 | RESTAMP - COMMERCIAL v.1 | 06/20/2025 | APPROVED |
| 06/06/2025 | COMMERCIAL REVIEW - FULL v.2 | 06/10/2025 | APPROVED |
| 03/24/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/06/2026 | APPROVED |
| 04/16/2025 | COMMERCIAL REVIEW - FULL v.1 | 05/08/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0425-00731
Permit Status: Complete
Permit Description: Speculative TI buildout in unoccupied Shell under separate permit.
| Date | Description | Comments |
|---|---|---|
| 04/16/2025 | BLDG 1 UNIT 1110 Needs to be added to cover sheet as part of the address to reflect this permit application. | |
| 04/16/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 04/16/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0425-00731
Permite Description: Speculative TI buildout in unoccupied Shell under separate permit.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2026 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 2/1/2026 interior walls electrical approved. Okay to proceed progress areas. |
| 12/29/2025 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | 12-29-25: verified proper sealing of Pookie joints-Okay to continue with construction at progress areas. |
| 04/09/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | 4-9-26: not applicable. |
| 11/17/2025 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 11-17-25: underground plumbing verified per plans. Okay to backfill-shading required. Note: schedule a dowel & vapor barrier inspection prior to pour back. |
| 12/09/2025 | COT - HCBU - Building Progress | N/A | Partial Pass | 12-9-25: partial pass for drywall screw inspection on south side of demising wall. Remaining section of demising wall not yet installed. Okay to tape & texture progress areas. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0425-00731
Permit Description: Speculative TI buildout in unoccupied Shell under separate permit.
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2026 | COT - HCBU - Framing | Passed | 0K to sheet rock interior walls. | |
| 03/04/2026 | BULD - Electrical Clearance | Passed | 3-4-26: okay to energize Suite 1110 panel #1. INCR clearance issued to TEP. | |
| 03/12/2026 | COT - HCEL - Electrical Intermediate | Passed | 3-12-26: electrical intermediate approved. | |
| 03/12/2026 | COT - HCEL - Electrical Progress | Passed | 3-12-26: approved. | |
| 03/12/2026 | COT - HCPL - Plumbing Above Ceiling | Passed | 3-12-26: approved. | |
| 03/12/2026 | COT - HCPL - Plumbing Intermediate | Passed | 3-12-26: plumbing intermediate approved. | |
| 03/26/2026 | COT - HCME - Mechanical Intermediate | Passed | 3-26-26: mechanical intermediate approved. | |
| 04/27/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 04/27/2026 | ENGR Engineering Final | Passed | Site is safe and complete in accordance with approved plans. | |
| 04/27/2026 | COT - HCME - Mechanical Progress | Passed | 4-27-26: approved. | |
| 04/27/2026 | COT - HCPL - Plumbing Progress | Passed | 4-27-26: approved. | |
| 04/27/2026 | COT - HCBU - Building Progress | Passed | 4-27-26: approved-pending finals. | |
| 05/01/2026 | COT - HCME - Mechanical Above Ceiling | Passed | 5-1-26: mechanical above ceiling approved. | |
| 05/01/2026 | COT - HCEL - Electrical Above Ceiling | Passed | 5-1-26: electrical above ceiling approved. | |
| 05/13/2026 | COT - HCPL - Plumbing Final | Passed | 5-13-26: plumbing final approved. | |
| 05/13/2026 | COT - HCME - Mechanical Final | Passed | 5-13-26: mechanical final approved. | |
| 05/13/2026 | COT - HCBU - Building Final | Passed | 5-13-26: building final approved. | |
| 05/13/2026 | COT - HCBU - Building Above Ceiling | Passed | 5-13-26: building above ceiling approved. | |
| 05/13/2026 | COT - HCEL - Electrical Final | Passed | 5-13-26: electrical final approved. | |
| 05/14/2026 | COT - FCON - Alarm - Final | Passed | ||
| 05/14/2026 | COT - FCON - Fire - Final | Passed | ||
| 05/14/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 05/15/2026 | COT - HCBU - CofO | Passed | 5-15-26: building final approved. All conditions have been satisfied- okay to apply for C of O. |