Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
04/04/2025
Applicant:
Abelardo Robles
Description:
Replacing gas pipe from water heater and stove.

Permit Reviews

Permit Number - TC-COM-0425-00666
Permit Status: Complete
Permit Description: Replacing gas pipe from water heater and stove.
Start Date Submittal Complete Date Status  
04/07/2025 COMMERCIAL PDSD SIMPLE REVIEW v.1 04/10/2025 REQUIRES RESUBMIT Review Details
04/18/2025 COMMERCIAL PDSD SIMPLE REVIEW v.3 04/22/2025 APPROVED Review Details
04/14/2025 COMMERCIAL PDSD SIMPLE REVIEW v.2 04/14/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0425-00666
Permit Status: Complete
Permit Description: Replacing gas pipe from water heater and stove.
Date Description Comments
04/07/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0425-00666
Permite Description: Replacing gas pipe from water heater and stove.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/24/2025 COT - LCPL - Plumbing Final N/A Re-inspection required 4-24-25, pressure relieve valve required on gas water heater. The enclosure is missing front door. Secure the vent and enclosure to the plastered wall. Properly secure the insulation to the cvpc water lines with 10 mil tape.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0425-00666
Permit Description: Replacing gas pipe from water heater and stove.
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/24/2025 COT - BULD - SWG Clearance Passed 4-24-25, SWG clearance issued. For additional notes see plumbing final.
04/24/2025 COT - LCPL - Gas Pressure Test Passed 4-24-25, gas pressure test approved.
05/16/2025 COT - LCPL - Plumbing Final Passed 5/16/2025 approved.

Documents

File Name Document Type  
2_PROPOSED_PLAN_V3.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW