Permit: TC-COM-0425-00666
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
101 W LINCOLN ST UNIT 1
Address NEW:
101 W LINCOLN ST UNIT 1
Apply Date:
04/04/2025
Applicant:
Abelardo Robles
Description:
Replacing gas pipe from water heater and stove.
Permit Reviews
Permit Number - TC-COM-0425-00666
Permit Status: Complete
Permit Description: Replacing gas pipe from water heater and stove.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/07/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 04/10/2025 | REQUIRES RESUBMIT |
| 04/18/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.3 | 04/22/2025 | APPROVED |
| 04/14/2025 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 04/14/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0425-00666
Permit Status: Complete
Permit Description: Replacing gas pipe from water heater and stove.
| Date | Description | Comments |
|---|---|---|
| 04/07/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0425-00666
Permite Description: Replacing gas pipe from water heater and stove.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2025 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | 4-24-25, pressure relieve valve required on gas water heater. The enclosure is missing front door. Secure the vent and enclosure to the plastered wall. Properly secure the insulation to the cvpc water lines with 10 mil tape. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0425-00666
Permit Description: Replacing gas pipe from water heater and stove.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2025 | COT - BULD - SWG Clearance | Passed | 4-24-25, SWG clearance issued. For additional notes see plumbing final. | |
| 04/24/2025 | COT - LCPL - Gas Pressure Test | Passed | 4-24-25, gas pressure test approved. | |
| 05/16/2025 | COT - LCPL - Plumbing Final | Passed | 5/16/2025 approved. |