Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0424-00734
Permit Details
Apply Date:
04/24/2024
Applicant:
Griffon Rowland
Description:
Relocate 110 panels from 2525 E Broadway to new solar canopy located on new combined lot. SAME DAY INSPECTION 8:00AM-10:00AM
Permit Reviews
Permit Number - TC-COM-0424-00734
Permit Status: Complete
Permit Description: Relocate 110 panels from 2525 E Broadway to new solar canopy located on new combined lot. SAME DAY INSPECTION 8:00AM-10:00AM
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/24/2024 | COMMERCIAL REVIEW - FULL v.1 | 04/24/2024 | REQUIRES RESUBMIT |
06/25/2024 | COMMERCIAL REVIEW - FULL v.3 | 06/27/2024 | APPROVED |
09/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/30/2024 | APPROVED |
05/01/2024 | COMMERCIAL REVIEW - FULL v.2 | 06/03/2024 | REQUIRES RESUBMIT |
09/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/11/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0424-00734
Permit Status: Complete
Permit Description: Relocate 110 panels from 2525 E Broadway to new solar canopy located on new combined lot. SAME DAY INSPECTION 8:00AM-10:00AM
Date | Description | Comments |
---|---|---|
06/03/2024 | SPECIAL INSPECTION FOR CONCRETE CONSTRUCTION IS REQUIRED. | |
06/03/2024 | FABRICATORS- SPECIAL INSPECTION OF FABRICATION OF STRUCTURAL STEEL BEING PERFORMED ON THE PREMSES OF THE FABRICATOR'S SHOP IS REQUIRED. EXCEPTION: SPECIAL INSPECTION OF FABRICATORS WITH ONE OF THE FOLLOWING QUALIFICATIONS IS NOT REQUIRED 1). INTERNATIONAL ACCREDITATION SERVICE, INS(IAS) APPROVED FABRICATOR. 2). AISC APPROVED FABRICATOR | |
09/11/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
06/03/2024 | SPECIAL INSPECTION FOR STRUCTURAL STEEL IS REQUIRED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0424-00734
Permite Description: Relocate 110 panels from 2525 E Broadway to new solar canopy located on new combined lot. SAME DAY INSPECTION 8:00AM-10:00AM
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/27/2024 | COT - CSOL - Electrical Progress Solar Project | N/A | Not Applicable | |
09/27/2024 | BULD - Electrical Clearance | N/A | Not Applicable | solar meter is active, no clearance required |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0424-00734
Permit Description: Relocate 110 panels from 2525 E Broadway to new solar canopy located on new combined lot. SAME DAY INSPECTION 8:00AM-10:00AM
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/03/2024 | COT - LCBU - Excavation/Rebar/Zoning | Passed | Approved (3) pier / column foundations, okay for concrete placement | |
07/03/2024 | COT - CSOL - Electrical Underground Solar Project | Passed | ||
07/03/2024 | COT - CSOL - Grounding/Bonding Solar Project | Passed | ||
09/10/2024 | COT - CSOL - Electrical Final Solar Project | Passed | ||
09/10/2024 | COT - LCBU - Building Final | Passed | Approved and complete pending special reports | |
09/10/2024 | ENGR Engineering Final | Passed | ||
09/10/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
09/27/2024 | COT - CSOL - Electrical Intermediate Solar Project | Passed | ||
09/27/2024 | COT - LCBU - Framing | Passed | approved per attached special inspection reports |