Permit: TC-COM-0424-00704
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
3924 E GRANT RD
Address NEW:
3924 E GRANT RD
Apply Date:
04/19/2024
Applicant:
Jose contreras
Description:
Tenant improvement for a salad restaurant in an existing vacant space. No site work will be performed.
Permit Reviews
Permit Number - TC-COM-0424-00704
Permit Status: Inspections complete
Permit Description: Tenant improvement for a salad restaurant in an existing vacant space.
No site work will be performed.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/09/2025 | RESTAMP - COMMERCIAL v.1 | 05/13/2025 | APPROVED |
| 04/22/2024 | COMMERCIAL REVIEW - FULL v.1 | 05/28/2024 | REQUIRES RESUBMIT |
| 10/15/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/19/2026 | APPROVED |
| 07/30/2024 | COMMERCIAL REVIEW - FULL v.2 | 08/28/2024 | REQUIRES RESUBMIT |
| 05/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/20/2025 | APPROVED |
| 04/17/2025 | COMMERCIAL REVIEW - FULL v.5 | 05/09/2025 | APPROVED |
| 03/11/2025 | COMMERCIAL REVIEW - FULL v.4 | 04/02/2025 | REQUIRES RESUBMIT |
| 02/11/2025 | COMMERCIAL REVIEW - FULL v.3 | 02/26/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0424-00704
Permit Status: Inspections complete
Permit Description: Tenant improvement for a salad restaurant in an existing vacant space.
No site work will be performed.
| Date | Description | Comments |
|---|---|---|
| 05/21/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 04/22/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 05/24/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 05/24/2024 | This project requires the completion of a Fire Construction Permit PRIOR TO FINALING this permit. | |
| 05/21/2024 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor. | |
| 02/11/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 05/21/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0424-00704
Permite Description: Tenant improvement for a salad restaurant in an existing vacant space.
No site work will be performed.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/24/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 10/24/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0424-00704
Permit Description: Tenant improvement for a salad restaurant in an existing vacant space.
No site work will be performed.
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2025 | COT - HCPL - Rough Soil | Passed | 7-25-25: underground plumbing approved. Okay to backfill progress areas. | |
| 08/13/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 08/13/2025 | COT - LCBU - Framing | Passed | ||
| 08/13/2025 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 10/22/2025 | COT - LCEL - Electrical Final | Passed | ||
| 10/22/2025 | COT - LCPL - Plumbing Final | Passed | ||
| 10/22/2025 | COT - LCME - Mechanical Intermediate | Passed | ||
| 10/22/2025 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 10/22/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 10/22/2025 | COT - FCON - Fire - Final | Passed | ||
| 10/22/2025 | COT - HCBU - CofO | Passed | ||
| 10/24/2025 | COT - LCME - Mechanical Final | Passed | ||
| 11/03/2026 | COT - LCBU - Building Final | Passed |