Permit: TC-COM-0424-00703
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
775 W SILVERLAKE RD
Address NEW:
775 W SILVERLAKE RD
Apply Date:
04/18/2024
Applicant:
Eric Young
Description:
Site: Future Temporary Generator with Future Temporary Fencing surround. New out door Tap Box and new Switch Gear in existing electrical room.
Permit Reviews
Permit Number - TC-COM-0424-00703
Permit Status: Inspections
Permit Description: Site: Future Temporary Generator with Future Temporary Fencing surround. New out door Tap Box and new Switch Gear in existing electrical room.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/22/2024 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 05/01/2024 | REQUIRES RESUBMIT |
| 05/06/2024 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 05/06/2024 | REQUIRES RESUBMIT |
| 05/07/2024 | COMMERCIAL PDSD SIMPLE REVIEW v.3 | 05/21/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0424-00703
Permit Status: Inspections
Permit Description: Site: Future Temporary Generator with Future Temporary Fencing surround. New out door Tap Box and new Switch Gear in existing electrical room.
| Date | Description | Comments |
|---|---|---|
| 04/22/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0424-00703
Permite Description: Site: Future Temporary Generator with Future Temporary Fencing surround. New out door Tap Box and new Switch Gear in existing electrical room.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/30/2025 | COT - LCEL - Electrical Underground | N/A | Partial Pass | 4-30-25, verified depth on a total of 10-4" Schedule 40 electrical conduits for generator. Okay to backfill & pour. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0424-00703
Permit Description: Site: Future Temporary Generator with Future Temporary Fencing surround. New out door Tap Box and new Switch Gear in existing electrical room.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2025 | BULD - Electrical Clearance | Passed | 08/01/25 TEP CLEARANCE: RECN called TEP at 8:05 PM. |
|
| 08/12/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 08/12/2025 | COT - LCEL - Electrical Underground | Passed | ||
| 08/12/2025 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 08/12/2025 | COT - LCEL - Grounding/Bonding | Passed | ||
| 08/13/2025 | COT - LCEL - Electrical Final | Passed |