Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Apply Date:
04/18/2024
Applicant:
Alizabeth Potucek
Description:
(Plan set under TD-DEV-0324-00106) - NEW DOG PARK/NEW PLAYGROUND AND SHADE STRUCTURE This project is a park improvement design for John F. Kennedy Park, for the City of Tucson Parks and Recreation Project. The project includes: 1. Addition of a new dog park, including 5' sidewalks from parking area to two existing ramadas, chainlink fence and gates, and new trees with irrigation. 2. Addition of 5' sidewalk connecting existing restrooms and ADA parking to playground. 3. Striping of existing parking for dog park and playground. 4. Addition of a playground and shade sail, to be installed by a separate Contractor. 5. ADA-compliant ramps connecting existing ramada to playground area, to be installed by a separate Contractor.

Permit Reviews

Permit Number - TC-COM-0424-00700
Permit Status: Inspections complete
Permit Description: (Plan set under TD-DEV-0324-00106) - NEW DOG PARK/NEW PLAYGROUND AND SHADE STRUCTURE This project is a park improvement design for John F. Kennedy Park, for the City of Tucson Parks and Recreation Project. The project includes: 1. Addition of a new dog park, including 5' sidewalks from parking area to two existing ramadas, chainlink fence and gates, and new trees with irrigation. 2. Addition of 5' sidewalk connecting existing restrooms and ADA parking to playground. 3. Striping of existing parking for dog park and playground. 4. Addition of a playground and shade sail, to be installed by a separate Contractor. 5. ADA-compliant ramps connecting existing ramada to playground area, to be installed by a separate Contractor.
Start Date Submittal Complete Date Status  
08/01/2024 RESTAMP - COMMERCIAL v.1 08/01/2024 APPROVED Review Details
04/23/2024 COMMERCIAL REVIEW - FULL v.1 05/07/2024 REQUIRES RESUBMIT Review Details
07/01/2024 COMMERCIAL REVIEW - FULL v.2 08/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0424-00700
Permit Status: Inspections complete
Permit Description: (Plan set under TD-DEV-0324-00106) - NEW DOG PARK/NEW PLAYGROUND AND SHADE STRUCTURE This project is a park improvement design for John F. Kennedy Park, for the City of Tucson Parks and Recreation Project. The project includes: 1. Addition of a new dog park, including 5' sidewalks from parking area to two existing ramadas, chainlink fence and gates, and new trees with irrigation. 2. Addition of 5' sidewalk connecting existing restrooms and ADA parking to playground. 3. Striping of existing parking for dog park and playground. 4. Addition of a playground and shade sail, to be installed by a separate Contractor. 5. ADA-compliant ramps connecting existing ramada to playground area, to be installed by a separate Contractor.
Total Outstanding Activity Conditions - 3
Date Name
05/07/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
05/07/2024 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.
05/07/2024 SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0424-00700
Permit Description: (Plan set under TD-DEV-0324-00106) - NEW DOG PARK/NEW PLAYGROUND AND SHADE STRUCTURE This project is a park improvement design for John F. Kennedy Park, for the City of Tucson Parks and Recreation Project. The project includes: 1. Addition of a new dog park, including 5' sidewalks from parking area to two existing ramadas, chainlink fence and gates, and new trees with irrigation. 2. Addition of 5' sidewalk connecting existing restrooms and ADA parking to playground. 3. Striping of existing parking for dog park and playground. 4. Addition of a playground and shade sail, to be installed by a separate Contractor. 5. ADA-compliant ramps connecting existing ramada to playground area, to be installed by a separate Contractor.
Total Completed Inspections - 7
Date Description Inspector Results Comments
09/25/2024 COT - LCBU - Excavation/Rebar/Zoning Passed
10/16/2024 ENGR Engineering Final Passed
10/16/2024 COT - LCBU - Building Final Passed
10/16/2024 COT - LCPL - Plumbing Final Passed
10/16/2024 TRSP - ROW - Final/Close-Out Passed
10/16/2024 COT - LCBU - Framing Passed
10/16/2024 COT - LCBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-KENNEDY_PARK_100 SUBMITTAL_6.14.2024_V2.PDF DOCUMENTS VIEW
SO0239351 CITY OF TUCSON-JFK NEW PLAYGROUND AZ - CALCULATIONS_SEALED (1)_V1.PDF DOCUMENTS VIEW