Permit: TC-COM-0424-00609
Permit Details
Apply Date:
04/05/2024
Applicant:
Brad Roman
Description:
Ground up construction, including site work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Permit Reviews
Permit Number - TC-COM-0424-00609
Permit Status: Complete
Permit Description: Ground up construction, including site work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/25/2025 | REQUIRES RESUBMIT |
| 09/24/2024 | COMMERCIAL REVIEW - FULL v.1 | 09/27/2024 | APPROVED |
| 01/02/2025 | COMMERCIAL REVIEW - FULL v.1 | 01/24/2025 | APPROVED |
| 09/17/2024 | RESTAMP - COMMERCIAL v.1 | 09/20/2024 | REQUIRES RESUBMIT |
| 04/05/2024 | COMMERCIAL REVIEW - FULL v.1 | 05/07/2024 | REQUIRES RESUBMIT |
| 08/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/21/2025 | APPROVED |
| 08/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/18/2025 | APPROVED |
| 11/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/27/2024 | APPROVED |
| 09/17/2024 | COMMERCIAL REVIEW - FULL v.4 | 09/17/2024 | APPROVED |
| 09/27/2024 | RESTAMP - COMMERCIAL v.2 | 10/01/2024 | APPROVED |
| 12/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/18/2024 | APPROVED |
| 05/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/12/2025 | APPROVED |
| 05/23/2024 | COMMERCIAL REVIEW - FULL v.2 | 06/24/2024 | REQUIRES RESUBMIT |
| 10/30/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/04/2024 | APPROVED |
| 08/16/2024 | COMMERCIAL REVIEW - FULL v.3 | 09/17/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0424-00609
Permit Status: Complete
Permit Description: Ground up construction, including site work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
| Date | Description | Comments |
|---|---|---|
| 05/03/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 12/18/2024 | ||
| 08/27/2024 | SPECIAL INSPECTION FOR CONCRETE CONSTRUCTION IS REQUIRED. | |
| 04/05/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 08/27/2024 | SPECIAL INSPECTION FOR EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) IS REQUIRED. | |
| 08/27/2024 | SPECIAL INSPECTION FOR FABRICATED ITEMS IS REQUIRED. | |
| 05/03/2024 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Lucinda.Hyatt@pima.gov for review and assessment of the proposed grease interceptor. | |
| 04/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/27/2024 | SPECIAL INSPECTION FOR SOILS IS REQUIRED. | |
| 08/27/2024 | Truss Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 09/17/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0424-00609
Permite Description: Ground up construction, including site work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0424-00609
Permit Description: Ground up construction, including site work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Total Completed Inspections - 25
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2025 | COT - LCBU - Preslab | Passed | 1/30/25: reinforcement per plan at slab ok to pour | |
| 01/30/2025 | COT - LCBU - Excavation/Rebar/Zoning | Passed | 1/30/25: reinforcement per plan at slab ok to pour. 2/20/2025 inspected rebar at light poles. EWS | |
| 02/28/2025 | COT - LCBU - Roof Nailing | Passed | ||
| 03/19/2025 | COT - LCEL - Electrical Progress | Passed | ||
| 03/19/2025 | COT - LCPL - Plumbing Roof Drains | Passed | ||
| 03/19/2025 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 04/10/2025 | COT - LCBU - Framing | Passed | ||
| 04/10/2025 | COT - LCBU - Masonry Pregrout | Passed | ||
| 04/10/2025 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 04/10/2025 | COT - LCME - Mechanical Intermediate | Passed | ||
| 04/10/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 04/15/2025 | COT - LCPL - Yard Water Line | Passed | Okay to backfill. Shading is required. 4/15/2025 | |
| 04/15/2025 | COT - LCPL - Sewer | Passed | Okay to backfill. Shading is required. 4/15/2025 | |
| 07/16/2025 | COT - LCPL - Plumbing Final | Passed | ||
| 07/25/2025 | BULD - Electrical Clearance | Passed | Ok to set meter and begin new service. Service was change from single phase power to three phase power as per request from TEP. | |
| 08/06/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 08/07/2025 | COT - LCEL - Electrical Underground | Passed | 8-7-25: approved. | |
| 08/07/2025 | COT - LCEL - Grounding/Bonding | Passed | 8-7-25: approved | |
| 08/07/2025 | COT - LCEL - Outdoor Lighting | Passed | 8-7-25: approved | |
| 08/08/2025 | COT - LCBU - Building Final | Passed | ||
| 08/08/2025 | COT - LCPL - Rough Soil | Passed | ||
| 08/08/2025 | COT - LCME - Mechanical Final | Passed | Approved. 8/8/2025 | |
| 08/08/2025 | COT - LCEL - Electrical Final | Passed | Approved. 8/8/2025 | |
| 08/13/2025 | COT - FCON - Fire - Final | Passed | ||
| 08/14/2025 | ENGR Engineering Final | Passed | CO Ready |