Permit: TC-COM-0423-01165
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
941 W FAIRVIEW BUSINESS PARK PL
Address NEW:
941 W FAIRVIEW BUSINESS PARK PL
Apply Date:
04/28/2023
Applicant:
Dave DeGroff
Description:
PROVIDE A NEW 2,000 GAL. ABOVE-GROUND D.E.F. (DIESEL EXHAUST FLUID) TANK ON A NEW CONCRETE SUPPORT SLAB, PROVIDE NEW DEF PIPING SYSTEM AND (2) TWO NEW DEF DISPENSERS ON NEW ISLANDS.
Permit Reviews
Permit Number - TC-COM-0423-01165
Permit Status: Complete
Permit Description: PROVIDE A NEW 2,000 GAL. ABOVE-GROUND D.E.F. (DIESEL EXHAUST FLUID) TANK ON A NEW CONCRETE SUPPORT SLAB, PROVIDE NEW DEF PIPING SYSTEM AND (2) TWO NEW DEF DISPENSERS ON NEW ISLANDS.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/30/2023 | RESTAMP - COMMERCIAL v.1 | 11/06/2023 | APPROVED |
| 05/05/2023 | COMMERCIAL REVIEW - FULL v.1 | 06/09/2023 | REQUIRES RESUBMIT |
| 10/09/2023 | COMMERCIAL REVIEW - FULL v.2 | 10/30/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0423-01165
Permit Status: Complete
Permit Description: PROVIDE A NEW 2,000 GAL. ABOVE-GROUND D.E.F. (DIESEL EXHAUST FLUID) TANK ON A NEW CONCRETE SUPPORT SLAB, PROVIDE NEW DEF PIPING SYSTEM AND (2) TWO NEW DEF DISPENSERS ON NEW ISLANDS.
| Date | Description | Comments |
|---|---|---|
| 11/03/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0423-01165
Permit Description: PROVIDE A NEW 2,000 GAL. ABOVE-GROUND D.E.F. (DIESEL EXHAUST FLUID) TANK ON A NEW CONCRETE SUPPORT SLAB, PROVIDE NEW DEF PIPING SYSTEM AND (2) TWO NEW DEF DISPENSERS ON NEW ISLANDS.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/25/2024 | COT - LCBU - Preslab | Passed | Rebar per plan. Detail 101. S1. Okay for concrete placement. 1/25/24 | |
| 01/25/2024 | COT - LCEL - Grounding/Bonding | Passed | ||
| 01/31/2024 | COT - LCEL - Electrical Underground | Passed | 2 UDC ( underground dispenser container), to Transition pump, To the gutter into the building. Okay to backfill. Shading required. 1/31/2024 | |
| 02/20/2024 | COT - LCEL - Electrical Final | Passed | ||
| 07/24/2024 | COT - FCON - Fire - Final | Passed | ||
| 07/24/2024 | ENGR Engineering Final | Passed | ||
| 08/13/2024 | COT - LCBU - Building Final | Passed |