Permit: TC-COM-0423-01162
Permit Details
Apply Date:
04/27/2023
Applicant:
Lisa Bowers
Description:
New Restaurant with Drive Thru
Permit Reviews
Permit Number - TC-COM-0423-01162
Permit Status: Complete
Permit Description: New Restaurant with Drive Thru
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/25/2023 | COMMERCIAL REVIEW - FULL v.3 | 08/09/2023 | REQUIRES RESUBMIT |
09/26/2023 | COMMERCIAL REVIEW - FULL v.1 | 10/06/2023 | APPROVED |
08/17/2023 | COMMERCIAL REVIEW - FULL v.4 | 08/18/2023 | APPROVED |
03/14/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.4 | 03/18/2024 | APPROVED |
08/25/2023 | COMMERCIAL REVIEW - FULL v.1 | 09/07/2023 | REQUIRES RESUBMIT |
10/11/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/25/2023 | APPROVED |
05/01/2023 | COMMERCIAL REVIEW - FULL v.1 | 06/06/2023 | REQUIRES RESUBMIT |
01/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/17/2024 | REQUIRES RESUBMIT |
08/18/2023 | RESTAMP - COMMERCIAL v.1 | 08/21/2023 | REQUIRES RESUBMIT |
03/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/20/2024 | APPROVED |
03/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 03/12/2024 | REQUIRES RESUBMIT |
09/07/2023 | COMMERCIAL REVIEW - FULL v.2 | 09/08/2023 | APPROVED |
02/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/29/2024 | REQUIRES RESUBMIT |
06/28/2023 | COMMERCIAL REVIEW - FULL v.2 | 07/18/2023 | REQUIRES RESUBMIT |
10/31/2023 | COMMERCIAL REVIEW - FULL v.1 | 11/09/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0423-01162
Permit Status: Complete
Permit Description: New Restaurant with Drive Thru
Date | Description | Comments |
---|---|---|
07/18/2023 | AIR BALANCING REPORT IS REQUIRED. | |
03/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
07/31/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
07/31/2023 | Walk in Cooler Designs must be submitted and approved prior to final. | |
03/18/2024 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. | |
03/15/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
03/18/2024 | Please submit a separate sign permit for an signs associated with this project. | |
07/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. P23WX00979 | |
03/15/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
07/31/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
07/18/2023 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0423-01162
Permite Description: New Restaurant with Drive Thru
Total Outstanding Inspections - 14
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/05/2023 | COT - HCBU - Stem Wall/Retaining Wall | N/A | Not Applicable | 10/5/23 not a required inspection |
11/20/2023 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | |
11/08/2023 | COT - HCPL - Yard Water Line | N/A | Partial Pass | Partial pass. Pending point of connection to the building about 5’ and to the water meter about 20’ Approximately 110’ of 2” scheduled 40 PVC. Okay to backfill. Shading is required. 11/8/2023 |
01/02/2024 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | 1/2/24 first lift ok for grout |
11/13/2023 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 11/13/2023 footings for walk ins per plan. (F-7). Okay for concrete placement. |
11/20/2023 | COT - HCME - Venting | N/A | Not Ready | |
02/28/2024 | COT - HCPL - Gas Final | N/A | Not Applicable | |
02/28/2024 | COT - HCPL - Gas Pressure Test | N/A | Not Applicable | |
11/14/2023 | COT - HCPL - Sewer | N/A | Partial Pass | 11/14/23 partial for interceptor and clean outs/vent line |
01/03/2024 | COT - HCBU - Building Above Ceiling | N/A | Not Ready | |
01/17/2024 | COT - HCEL - Outdoor Lighting | N/A | Partial Pass | |
10/18/2023 | BULD - Electrical Clearance | N/A | Partial Pass | 10/18/23: TEP TMPP CLEARANCE AT 1993 E AJO WY (temp power) |
03/06/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
PDSD Heavy Commercial Building Division Pre-Construction Meeting | N/A | Requested |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0423-01162
Permit Description: New Restaurant with Drive Thru
Total Completed Inspections - 29