Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Withdrawn
Type:
Commercial Building
Address NEW:
8750 E GOLF LINKS RD
Apply Date:
04/25/2023
Applicant:
Troy White
Description:
New Shell Building, electrical, water, sewer, etc

Permit Reviews

Permit Number - TC-COM-0423-01136
Permit Status: Withdrawn
Permit Description: New Shell Building, electrical, water, sewer, etc
Start Date Submittal Complete Date Status  
05/01/2023 COMMERCIAL REVIEW - FULL v.1 10/04/2023 REQUIRES RESUBMIT Review Details
10/04/2023 COMMERCIAL REVIEW - FULL v.2 10/16/2023 APPROVED Review Details
10/16/2023 RESTAMP - COMMERCIAL v.1 10/18/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0423-01136
Permit Status: Withdrawn
Permit Description: New Shell Building, electrical, water, sewer, etc
Total Outstanding Activity Conditions - 13
Date Name
07/28/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
07/28/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/04/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
10/04/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/04/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/04/2023 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
10/04/2023 Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection.
10/04/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
10/04/2023 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
10/04/2023 Masonry Inspection Report submittal review is required.
10/04/2023 Post-Installed Anchor Inspection Report is required.
10/04/2023 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
10/04/2023 WATER STERILIZATION REPORT IS REQUIRED.

Documents

File Name Document Type  
CONS-CONS-STANTEC_APPROVED_PLANS_V1_V2.PDF DOCUMENTS VIEW
STANTEC_APPROVED_CALCS_MECH_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_CALCS_STRUCT1_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_CALCS_STRUCT2_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_ENERGY_BLDG_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_ENERGY_MECH_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_GEOTECH_V1.PDF DOCUMENTS VIEW
STANTEC_SPEC_INSP_CERT-2023-10-04_V1.PDF DOCUMENTS VIEW
1_MECH_CHECK_V1.PDF DOCUMENTS VIEW
1_MECH_REPORT_V1.PDF DOCUMENTS VIEW
1_PSA_V1.PDF DOCUMENTS VIEW
1_SOILS_REPORT_V1.PDF DOCUMENTS VIEW
1_STRUCT_CALCS-PT1_V1.PDF DOCUMENTS VIEW
1_STRUCT_CALCS-PT2_V1.PDF DOCUMENTS VIEW
CONS-1_PLAN_SET_V1.PDF DOCUMENTS VIEW