Permit: TC-COM-0423-00939
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
5870 E BROADWAY BL
Address NEW:
5870 E BROADWAY BL
Apply Date:
04/01/2023
Applicant:
kaitlen fowler
Description:
Partial remodel of the existing Foot Locker House of Hoops store
Permit Reviews
Permit Number - TC-COM-0423-00939
Permit Status: Complete
Permit Description: Partial remodel of the existing Foot Locker House of Hoops store
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/13/2023 | COMMERCIAL REVIEW - FULL v.1 | 06/27/2023 | APPROVED |
| 05/03/2023 | COMMERCIAL REVIEW - FULL v.2 | 05/23/2023 | APPROVED |
| 05/23/2023 | RESTAMP - COMMERCIAL v.1 | 05/24/2023 | APPROVED |
| 04/05/2023 | COMMERCIAL REVIEW - FULL v.1 | 04/24/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0423-00939
Permit Status: Complete
Permit Description: Partial remodel of the existing Foot Locker House of Hoops store
| Date | Description | Comments |
|---|---|---|
| 05/24/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0423-00939
Permite Description: Partial remodel of the existing Foot Locker House of Hoops store
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2023 | COT - HCBU - Building Final | N/A | Canceled | |
| 08/30/2023 | COT - FCON - Alarm - Final | N/A | Not Applicable | |
| 09/21/2023 | COT - FCON - Sprinkler - Final | N/A | Not Applicable | No sprinkler work was done. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0423-00939
Permit Description: Partial remodel of the existing Foot Locker House of Hoops store
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/13/2023 | COT - HCBU - Building Progress | Passed | 7/13/23: met superintendent Jim on site. Informed him to provide approved plans on site for the final inspection. | |
| 08/03/2023 | COT - HCEL - Electrical Final | Passed | ||
| 08/04/2023 | COT - HCBU - Building Final | Passed | ||
| 09/13/2023 | COT - FCON - Fire - Final | Passed | ||
| 09/21/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
| 09/21/2023 | ENGR Engineering Final | Passed | I spoke to Dave Roberts about this project. He informed me to give it a Partial pass, pending on more information that he’ll give me. Dave Roberts called me back and told me to pass it |