Permit: TC-COM-0326-00440
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
8665 E SPEEDWAY BL UNIT 701
Address NEW:
8665 E SPEEDWAY BL UNIT 701
Apply Date:
03/30/2026
Applicant:
Danny Quihuis
Description:
Reconstruction of a damaged exterior wall at one of the units.
Permit Reviews
Permit Number - TC-COM-0326-00440
Permit Status: Inspections complete
Permit Description: Reconstruction of a damaged exterior wall at one of the units.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/06/2026 | COMMERCIAL REVIEW - LIMITED v.2 | 05/11/2026 | APPROVED |
| 04/02/2026 | COMMERCIAL REVIEW - LIMITED v.1 | 04/16/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0326-00440
Permit Status: Inspections complete
Permit Description: Reconstruction of a damaged exterior wall at one of the units.
| Date | Description | Comments |
|---|---|---|
| 04/02/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 04/02/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0326-00440
Permite Description: Reconstruction of a damaged exterior wall at one of the units.
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2026 | COT - BULD - SWG Clearance | N/A | Canceled | |
| 07/16/2026 | COT - LCPL - Plumbing Final | N/A | Canceled | |
| 07/17/2026 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 08/03/2026 | COT - LCME - Mechanical Final | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0326-00440
Permit Description: Reconstruction of a damaged exterior wall at one of the units.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2026 | COT - LCBU - Framing | Passed | Passed | |
| 11/03/2026 | COT - LCBU - Building Final | Passed | ||
| 11/03/2026 | COT - LCEL - Electrical Final | Passed |