Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Address NEW:
292 S FREEWAY UNIT 2M
Apply Date:
03/26/2026
Applicant:
Scott Patka
Description:
Service equipment replacement in same location at 292 S Freeway 2M. Installation of new 200A meter/main service equipment. Includes new underground conduit from existing utility transformer to service location. No change to building footprint or interior electrical distribution.

Permit Reviews

Permit Number - TC-COM-0326-00431
Permit Status: Inspections
Permit Description: Service equipment replacement in same location at 292 S Freeway 2M. Installation of new 200A meter/main service equipment. Includes new underground conduit from existing utility transformer to service location. No change to building footprint or interior electrical distribution.
Start Date Submittal Complete Date Status  
03/26/2026 COMMERCIAL PDSD SIMPLE REVIEW v.1 03/27/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0326-00431
Permit Status: Inspections
Permit Description: Service equipment replacement in same location at 292 S Freeway 2M. Installation of new 200A meter/main service equipment. Includes new underground conduit from existing utility transformer to service location. No change to building footprint or interior electrical distribution.
Date Description Comments
03/26/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0326-00431
Permit Description: Service equipment replacement in same location at 292 S Freeway 2M. Installation of new 200A meter/main service equipment. Includes new underground conduit from existing utility transformer to service location. No change to building footprint or interior electrical distribution.
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/16/2026 BULD - Electrical Clearance Passed 7-16-2026 INCR Approved

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
292 S FREEWAY 2M SITE PLAN_V1.PDF DOCUMENTS VIEW