Permit: TC-COM-0326-00363
Permit Details
Apply Date:
03/13/2026
Applicant:
April Holmes
Description:
Roll Form Standing Seam. Project start date will be 11/17 or as soon as Metal Arrives on site from the manufacturer. Project completion will be within 3-4 weeks of start date Tear Off: Remove existing roof system down to decking. Decking and Fascia: Inspect all wood for damages and replace as needed: Prepared For Karla Schumann - Teamsters - Standing Seam 24G- Repair Existing Metal 238 West Elm Street, Tucson, AZ 85705 L.C. Estimate # Date 40138 10/06/2025 Total $0.00 $0.00 $41,025.00 $38,985.00 Prepare roof deck for new system, removing all petruding fasteners, existing jacks and metal f lashings. Underlayment: Install CMI Max Secure Grip 2.0 Underlayment to create a waterproof membrane over all facets of the roof. Metal Installation: Install direct to deck 24 gauge steel. 16 inch panels flat or w/ striations 1.5 inch locking seam - clip fastened Finish - PVDF Color - TBD Trim: Drip-edge over facia Rake - hidden fastener Vented Ridge secured by Z closer Flashing: Install all proper flashings to all fixtures and penetrations - HVAC, B-vents, Pipe Jacks, and electrical Conduits. Clean Up: Clean and haul away debris. Run magnetic roller around premises to pick up all scrap metal and stray nails.
Permit Reviews
Permit Number - TC-COM-0326-00363
Permit Status: Issued
Permit Description: Roll Form Standing Seam. Project start date will be 11/17 or as soon as Metal Arrives on site from the manufacturer. Project completion will be within 3-4 weeks of start date Tear Off: Remove existing roof system down to decking. Decking and Fascia: Inspect all wood for damages and replace as needed: Prepared For Karla Schumann - Teamsters - Standing Seam 24G- Repair Existing Metal 238 West Elm Street, Tucson, AZ 85705 L.C. Estimate # Date 40138 10/06/2025 Total $0.00 $0.00 $41,025.00 $38,985.00 Prepare roof deck for new system, removing all petruding fasteners, existing jacks and metal f lashings. Underlayment: Install CMI Max Secure Grip 2.0 Underlayment to create a waterproof membrane over all facets of the roof. Metal Installation: Install direct to deck 24 gauge steel. 16 inch panels flat or w/ striations 1.5 inch locking seam - clip fastened Finish - PVDF Color - TBD Trim: Drip-edge over facia Rake - hidden fastener Vented Ridge secured by Z closer Flashing: Install all proper flashings to all fixtures and penetrations - HVAC, B-vents, Pipe Jacks, and electrical Conduits. Clean Up: Clean and haul away debris. Run magnetic roller around premises to pick up all scrap metal and stray nails.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/18/2026 | COMMERCIAL REVIEW - FULL v.1 | 03/18/2026 | REQUIRES RESUBMIT |
| 04/10/2026 | COMMERCIAL REVIEW - FULL v.2 | 05/04/2026 | APPROVED |
| 05/04/2026 | ADMINISTRATIVE v.1 | 05/04/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0326-00363
Permit Status: Issued
Permit Description: Roll Form Standing Seam. Project start date will be 11/17 or as soon as Metal Arrives on site from the manufacturer. Project completion will be within 3-4 weeks of start date Tear Off: Remove existing roof system down to decking. Decking and Fascia: Inspect all wood for damages and replace as needed: Prepared For Karla Schumann - Teamsters - Standing Seam 24G- Repair Existing Metal 238 West Elm Street, Tucson, AZ 85705 L.C. Estimate # Date 40138 10/06/2025 Total $0.00 $0.00 $41,025.00 $38,985.00 Prepare roof deck for new system, removing all petruding fasteners, existing jacks and metal f lashings. Underlayment: Install CMI Max Secure Grip 2.0 Underlayment to create a waterproof membrane over all facets of the roof. Metal Installation: Install direct to deck 24 gauge steel. 16 inch panels flat or w/ striations 1.5 inch locking seam - clip fastened Finish - PVDF Color - TBD Trim: Drip-edge over facia Rake - hidden fastener Vented Ridge secured by Z closer Flashing: Install all proper flashings to all fixtures and penetrations - HVAC, B-vents, Pipe Jacks, and electrical Conduits. Clean Up: Clean and haul away debris. Run magnetic roller around premises to pick up all scrap metal and stray nails.
| Date | Description | Comments |
|---|---|---|
| 03/18/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 03/18/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |