Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Address NEW:
170 S HOUGHTON RD
Apply Date:
03/28/2025
Applicant:
Lawrence McManus
Description:
Construction of a Dutch Bros Coffee drive-through.

Permit Reviews

Permit Number - TC-COM-0325-00633
Permit Status: Issued
Permit Description: Construction of a Dutch Bros Coffee drive-through.
Start Date Submittal Complete Date Status  
04/27/2026 COMMERCIAL REVIEW - FULL v.4 05/06/2026 APPROVED Review Details
06/09/2025 COMMERCIAL REVIEW - FULL v.2 06/09/2025 REQUIRES RESUBMIT Review Details
04/03/2025 COMMERCIAL REVIEW - FULL v.1 04/24/2025 REQUIRES RESUBMIT Review Details
10/10/2025 COMMERCIAL REVIEW - FULL v.3 10/31/2025 REQUIRES RESUBMIT Review Details
10/28/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/30/2026 APPROVED Review Details
05/06/2026 ADMINISTRATIVE v.1 05/06/2026 REQUIRES RESUBMIT Review Details
05/08/2026 ADMINISTRATIVE v.2 05/08/2026 APPROVED Review Details
05/08/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/12/2026 APPROVED Review Details
06/17/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/23/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0325-00633
Permit Status: Issued
Permit Description: Construction of a Dutch Bros Coffee drive-through.
Total Outstanding Activity Conditions - 6
Date Name
04/16/2025 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
04/24/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
05/05/2026 SPECIAL INSPECTION OF MASONRY CONSTRUCTION IS REQUIRED.
05/05/2026 SPECIAL INSPECTION OF SOILS IS REQUIRED.
05/05/2026 SPECIAL INSPECTION OF STRUCTURAL WOOD IS REQUIRED.
10/14/2025 AIR BALANCING REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0325-00633
Permit Status: Issued
Permit Description: Construction of a Dutch Bros Coffee drive-through.
Date Description Comments
04/03/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
04/24/2025 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
10/14/2025 An Outdoor Lighting Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
10/14/2025 Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor.
04/03/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
04/03/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
10/14/2025 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0325-00633
Permite Description: Construction of a Dutch Bros Coffee drive-through.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/23/2026 COT - BULD - SWG Clearance N/A Not Applicable
10/30/2026 COT - HCBU - Building Final N/A Canceled Scheduled to view permit information.
10/23/2026 COT - LCBU - Building Final N/A Partial Pass OK for Level Four.
10/23/2026 ENGR Engineering Final N/A Not Ready Outstanding conditions need to be satisfied. Submit Water Sterilization Report, and Pima County Health Department approval for TCO approval.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0325-00633
Permit Description: Construction of a Dutch Bros Coffee drive-through.
Total Completed Inspections - 28
Date Description Inspector Results Comments
06/09/2026 COT - LCPL - Rough Soil Passed
06/09/2026 COT - LCPL - Sewer Passed
06/16/2026 COT - LCEL - Electrical Underground Passed
06/22/2026 COT - LCBU - Excavation/Rebar/Zoning Passed Passed
07/10/2026 COT - LCBU - Roof Nailing Passed
07/20/2026 COT - LCPL - Yard Water Line Passed Passed
07/21/2026 COT - LCPL - Plumbing Intermediate Passed Passed
08/13/2026 COT - LCBU - Framing Passed
09/04/2026 COT - LCEL - Electrical Above Ceiling Passed
09/04/2026 COT - LCME - Mechanical Intermediate Passed
09/04/2026 COT - LCPL - Plumbing Roof Drains Passed
09/04/2026 COT - LCEL - Electrical Intermediate Passed
09/04/2026 COT - HCBU - Building Above Ceiling Passed Added in field.
09/04/2026 COT - HCME - Mechanical Above Ceiling Passed Added in field.
09/04/2026 COT - HCPL - Plumbing Above Ceiling Passed
09/15/2026 BULD - Electrical Clearance Passed ECO

TEP
10/07/2026 COT - LCME - Mechanical Final Passed
10/12/2026 COT - LCEL - Electrical Final Passed
10/20/2026 COT - FCON - Fire - Final Passed
10/23/2026 COT - LCPL - Plumbing Final Passed
10/23/2026 COT - LCBU - Preslab Passed
10/26/2026 TRSP - ROW - Notice of Completion Passed
10/23/2026 COT - HCEL - Electrical Underground Passed
10/23/2026 COT - LCBU - Building Progress Passed
10/23/2026 COT - LCBU - Masonry Pregrout Passed
10/23/2026 COT - LCBU - Stem Wall/Retaining Wall Passed
10/23/2026 COT - LCEL - Grounding/Bonding Passed
10/23/2026 COT - LCEL - Outdoor Lighting Passed

Documents

File Name Document Type  
COFO_TEMPORARYCOFO (SSRS).PDF DOCUMENTS VIEW
WATER STERILIZATION REPORT - DB HOUGHTON-2026-10-05_V1 (3)-2026-10-26_V1.PDF DOCUMENTS VIEW
SUBMITTAL_DUTCH BROS-HOUGHTON_REBID_FINAL NO NEED TO RESUBMIT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
SEWERCONNECTIONPERMIT_20260402_163311_V1.PDF DOCUMENTS VIEW
CONS-AZ0906 - TUCSON AZ - BUILDING RESUBMITTAL 2026-04-22_V3.PDF DOCUMENTS VIEW
SPAPP-COFT - PDSD - PERMIT CARD (SSRS)-2026-04-22_V1.PDF DOCUMENTS VIEW
TERRACON SPECIAL INSPECTIONS CERTIFICATE PART B SIGNED-2026-04-22_V1.PDF DOCUMENTS VIEW