Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Address:
810 W WETMORE RD
Address NEW:
810 W WETMORE RD
Apply Date:
03/27/2025
Applicant:
James Lynch
Description:
New 400amp 480V panel fed from Utility Transfomer. Install (3) Level-3 DCFC at 100amps 480V. Install 30kva step down transformer for 1 Level-2 charger at 100amps 208V

Permit Reviews

Permit Number - TC-COM-0325-00618
Permit Status: Inspections
Permit Description: New 400amp 480V panel fed from Utility Transfomer. Install (3) Level-3 DCFC at 100amps 480V. Install 30kva step down transformer for 1 Level-2 charger at 100amps 208V
Start Date Submittal Complete Date Status  
04/02/2025 COMMERCIAL REVIEW - LIMITED v.1 04/18/2025 REQUIRES RESUBMIT Review Details
06/06/2025 COMMERCIAL REVIEW - LIMITED v.2 06/27/2025 APPROVED Review Details
06/27/2025 RESTAMP - COMMERCIAL v.1 06/27/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0325-00618
Permit Status: Inspections
Permit Description: New 400amp 480V panel fed from Utility Transfomer. Install (3) Level-3 DCFC at 100amps 480V. Install 30kva step down transformer for 1 Level-2 charger at 100amps 208V
Date Description Comments
04/02/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
04/02/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0325-00618
Permite Description: New 400amp 480V panel fed from Utility Transfomer. Install (3) Level-3 DCFC at 100amps 480V. Install 30kva step down transformer for 1 Level-2 charger at 100amps 208V
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
07/14/2025 COT - LCEL - Electrical Underground N/A Partial Pass
11/13/2025 COT - FCON - Fire - Final N/A Not Applicable

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0325-00618
Permit Description: New 400amp 480V panel fed from Utility Transfomer. Install (3) Level-3 DCFC at 100amps 480V. Install 30kva step down transformer for 1 Level-2 charger at 100amps 208V
Total Completed Inspections - 3
Date Description Inspector Results Comments
11/03/2025 COT - LCEL - Electrical Underground Passed
11/13/2025 COT - LCEL - Electrical Final Passed 11.13.25
Approved
11/13/2025 COT - LCEL - Grounding/Bonding Passed 11.13.25
Grounding verified via video
Approved

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-HONDA TUCSON AUTO MALL - EV CHARGING STATIONS_ELECTRICAL RESUBMITTAL_052225_V2.PDF DOCUMENTS VIEW