Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0325-00600
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
118 E CONGRESS ST
Address NEW:
118 E CONGRESS ST
Apply Date:
03/24/2025
Applicant:
Andrew Venne
Description:
NARRATIVE/ THE OWNER OF BATCH BAR IS REMODELING THE SECOND FLOOR FROM OFFICE SPACE TO A BAR.
Permit Reviews
Permit Number - TC-COM-0325-00600
Permit Status: Complete
Permit Description: NARRATIVE/ THE OWNER OF BATCH BAR IS REMODELING THE SECOND FLOOR FROM OFFICE SPACE TO A BAR.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/29/2025 | APPROVED |
| 05/19/2025 | RESTAMP - COMMERCIAL v.1 | 05/22/2025 | APPROVED |
| 11/26/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/02/2025 | APPROVED |
| 03/27/2025 | COMMERCIAL REVIEW - FULL v.1 | 04/21/2025 | REQUIRES RESUBMIT |
| 04/25/2025 | COMMERCIAL REVIEW - FULL v.2 | 05/19/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0325-00600
Permit Status: Complete
Permit Description: NARRATIVE/ THE OWNER OF BATCH BAR IS REMODELING THE SECOND FLOOR FROM OFFICE SPACE TO A BAR.
| Date | Description | Comments |
|---|---|---|
| 04/21/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 03/27/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 04/21/2025 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 03/27/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 04/21/2025 | SPECIAL INSPECTION OF 1. The existing size and spacing of center girder per 3a of analysis 2. The final layout of super imposed deadload is to be reviewed by engineer to ensure 28PSF dead load and 100PSF live load is appropriate for all joists and regions on second floor. 3. Any damaged flooring or joists should be replaced by members of equivalent strength and elasticity IS REQUIRED. | |
| 04/21/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 04/21/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0325-00600
Permite Description: NARRATIVE/ THE OWNER OF BATCH BAR IS REMODELING THE SECOND FLOOR FROM OFFICE SPACE TO A BAR.
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2025 | COT - LCPL - Rough Soil | N/A | Not Applicable | |
| 10/30/2025 | COT - FCON - Fire - Final | N/A | Partial Pass | Need POA permit and locking FDC cap. |
| 11/18/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 11/18/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0325-00600
Permit Description: NARRATIVE/ THE OWNER OF BATCH BAR IS REMODELING THE SECOND FLOOR FROM OFFICE SPACE TO A BAR.
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2025 | COT - LCEL - Electrical Intermediate | Passed | In wall electric | |
| 07/07/2025 | COT - LCPL - Plumbing Intermediate | Passed | In wall plumbing is complete | |
| 10/30/2025 | COT - LCEL - Electrical Final | Passed | ||
| 10/30/2025 | COT - LCME - Mechanical Final | Passed | ||
| 10/30/2025 | COT - LCPL - Plumbing Final | Passed | ||
| 10/30/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 10/30/2025 | COT - LCBU - Framing | Passed | ||
| 10/30/2025 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 10/30/2025 | COT - LCME - Mechanical Intermediate | Passed | ||
| 11/14/2025 | ENGR Engineering Final | Passed | ||
| 11/14/2025 | COT - FCON - Fire - Final | Passed | ||
| 11/18/2025 | COT - FCON - Alarm - Final | Passed | ||
| 11/18/2025 | COT - LCBU - Building Final | Passed | ||
| 11/17/2025 | TRSP - ROW - Final/Close-Out | Passed |