Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Needs Resubmittal
Type:
Commercial Building
Address NEW:
2358 E BROADWAY BL
Apply Date:
03/14/2025
Applicant:
Lisa Bowers
Description:
Remodel interior of existing east building (plan set under TC-COM-0325-00503)

Permit Reviews

Permit Number - TC-COM-0325-00504
Permit Status: Needs resubmittal
Permit Description: Remodel interior of existing east building (plan set under TC-COM-0325-00503)
Start Date Submittal Complete Date Status  
09/26/2025 COMMERCIAL REVIEW - FULL v.4 10/20/2025 REQUIRES RESUBMIT Review Details
03/18/2025 COMMERCIAL REVIEW - FULL v.1 04/14/2025 REQUIRES RESUBMIT Review Details
08/27/2025 COMMERCIAL REVIEW - FULL v.3 09/16/2025 REQUIRES RESUBMIT Review Details
07/21/2025 COMMERCIAL REVIEW - FULL v.2 08/08/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0325-00504
Permit Status: Needs resubmittal
Permit Description: Remodel interior of existing east building (plan set under TC-COM-0325-00503)
Total Outstanding Activity Conditions - 14
Date Name
03/18/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
03/18/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/26/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
10/01/2025 AIR BALANCING REPORT IS REQUIRED.
10/01/2025 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
10/01/2025 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
10/01/2025 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
10/01/2025 Post-Installed Anchor Inspection Report is required.
10/01/2025 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
10/01/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
10/01/2025 STATE HEALTH LICENSE REQUIRED - PLEASE PROVIDE DOCUMENTATION.
10/01/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
10/01/2025 WATER STERILIZATION REPORT IS REQUIRED.
10/01/2025 SPECIAL INSPECTION FOR WELDING IS REQUIRED.