Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
1397 E FIMBRES ST
Apply Date:
03/12/2025
Applicant:
Dustyn Gauthier
Description:
New entry gate with electrical

Permit Reviews

Permit Number - TC-COM-0325-00487
Permit Status: Complete
Permit Description: New entry gate with electrical
Start Date Submittal Complete Date Status  
04/08/2025 COMMERCIAL FENCE/WALL v.2 04/23/2025 APPROVED Review Details
04/23/2025 RESTAMP - COMMERCIAL v.1 04/24/2025 APPROVED Review Details
03/12/2025 COMMERCIAL FENCE/WALL v.1 04/01/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0325-00487
Permit Status: Complete
Permit Description: New entry gate with electrical
Date Description Comments
04/24/2025 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
03/12/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0325-00487
Permite Description: New entry gate with electrical
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
05/06/2025 COT - LCBU - Building Final N/A Re-inspection required 5-6-25, excavation/rebar was never inspected so submit a letter to the city for review & approval. Letter must document that reinforcement was done per approved plans. Additionally, provide a pocket and reschedule an inspection so that footing depth can be verified.
05/06/2025 COT - LCBU - Excavation/Rebar/Zoning N/A Re-inspection required 5-6-25, excavation/rebar was never inspected so submit a letter to the city for review & approval. Letter must document that reinforcement was done per approved plans. Additionally, provide a pocket and reschedule an inspection so that footing depth can be verified.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0325-00487
Permit Description: New entry gate with electrical
Total Completed Inspections - 8
Date Description Inspector Results Comments
05/06/2025 ENGR Engineering Final Passed Gates are in accordance with approved plans.
05/06/2025 SITE - Zoning Final Passed Gates are in accordance with approved plans.
05/06/2025 TRSP - ROW - Final/Close-Out Passed
05/06/2025 BULD - Electrical Clearance Passed 5-6-25, panel for main gate is okay to be energized. ECO clearance issued to TEP
05/06/2025 COT - LCEL - Electrical Underground Passed 5-6-25, electrical underground approved.
05/06/2025 COT - LCEL - Electrical Final Passed 5-6-25, electrical final approved.
05/06/2025 COT - LCBU - Building Final Passed 5-6-25, building final approved.
05/06/2025 COT - LCBU - Excavation/Rebar/Zoning Passed 5-6-25, previously inspected & approved under a different permit.

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-MAIN ENTRY PLAN SET_V2.PDF DOCUMENTS VIEW