Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0325-00486
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
2606 S J CHRISTOPHER ST
Address NEW:
2606 S J CHRISTOPHER ST
Apply Date:
03/12/2025
Applicant:
Dustyn Gauthier
Description:
New entry gate with electrical
Permit Reviews
Permit Number - TC-COM-0325-00486
Permit Status: Inspections complete
Permit Description: New entry gate with electrical
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/28/2025 | RESTAMP - COMMERCIAL v.1 | 04/28/2025 | APPROVED |
| 04/14/2025 | COMMERCIAL FENCE/WALL v.3 | 04/28/2025 | APPROVED |
| 04/04/2025 | COMMERCIAL FENCE/WALL v.2 | 04/04/2025 | REQUIRES RESUBMIT |
| 03/12/2025 | COMMERCIAL FENCE/WALL v.1 | 04/01/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0325-00486
Permit Status: Inspections complete
Permit Description: New entry gate with electrical
| Date | Description | Comments |
|---|---|---|
| 03/12/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0325-00486
Permite Description: New entry gate with electrical
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2025 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 5-6-25, excavation/rebar was never inspected so submit a letter to the city for review & approval. Letter must document that reinforcement was done per approved plans. Additionally, provide a pocket and reschedule an inspection so that footing depth can be verified. |
| 05/06/2025 | COT - LCBU - Building Final | N/A | Re-inspection required | 5-6-25, excavation/rebar was never inspected so submit a letter to the city for review & approval. Letter must document that reinforcement was done per approved plans. Additionally, provide a pocket and reschedule an inspection so that footing depth can be verified. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0325-00486
Permit Description: New entry gate with electrical
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2025 | ENGR Engineering Final | Passed | Gates are in accordance with approved plans. | |
| 05/06/2025 | SITE - Zoning Final | Passed | Gates are in accordance with approved plans. | |
| 05/06/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 05/06/2025 | BULD - Electrical Clearance | Passed | 5-6-25, panel okay to be energized. ECO clearance issued to TEP. | |
| 05/06/2025 | COT - LCEL - Electrical Underground | Passed | 5-6-25, electrical underground approved. | |
| 05/06/2025 | COT - LCEL - Electrical Final | Passed | 5-6-25, electrical final approved. | |
| 05/06/2025 | COT - LCBU - Excavation/Rebar/Zoning | Passed | 5-6-25, previously inspected & approved under a different permit. | |
| 05/06/2025 | COT - LCBU - Building Final | Passed | 5-6-25, building final approved. |